Laserfiche WebLink
Demo Worksheet Cont'd Task#TTT Page 72 of 141 <br /> Truck Cycle Time: <br /> Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br /> Truck Load Time: 0.885 Minutes Adjusted for site altitude: 0.885 Minutes <br /> Truck Maneuver and Dump 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br /> Time: <br /> Truck Travel(Haul&Return)Time: Road Condition:Rutted dirt,little maintenance, no water,2"tire <br /> penetration 5.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1120.00 2.00 5.00 7.00 1568 0.747 <br /> Haul Time: 0.747 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1120.00 -2.00 5.00 3.00 2874 0.415 <br /> Return Time: 0.415 minutes <br /> Total Truck Cycle Time: 3.447 minutes <br /> Loading Toot unit <br /> Production 494.19 LCY/Hour Adjusted for job efficiency: 410.18 LCY/Hour <br /> Truck Unit Production <br /> 198.56 LCY/Hour Adjusted for job efficiency: 164.81 LCY/Hour <br /> Optimal No.of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 329.62 LCY/Hour <br /> Adjusted single truck/loader team production: 329.62 LCY/Hour <br /> Adjusted multiple truck/loader team production: 329.62 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 14.81 Hours <br /> Unit cost: $1.069 /LCY Totat job cost: $5,219 <br /> CIRCES Cost Estimating Software <br />