Laserfiche WebLink
Demo Worksheet Cont'd Task#TTT Page 69 of 141 <br /> Truck Cycle Time: <br /> Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br /> Truck Load Time: 1.308 Minutes Adjusted for site altitude: 1.308 Minutes <br /> Truck Maneuver and Dump 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br /> Time: <br /> Truck Travel(Haul&Return)Time: Road Condition:Rutted dirt,little maintenance, no water,2"tire <br /> penetration 5.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 10560.00 11.50 5.00 16.50 690 15.314 <br /> Haul Time: 15.314 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 10560.00 -11.50 5.00 -6.50 2938 3.705 <br /> Return Time: 3.705 minutes <br /> Total Truck Cycle Time: 21.727 minutes <br /> Loading Tool unit <br /> Production 504.90 LCY/Hour Adjusted for job efficiency: 419.06 LCY/Hour <br /> Truck Unit Production <br /> 42.00 LCY/Hour Adjusted for job efficiency: 34.86 LCY/Hour <br /> Optimal No.of Trucks: 12 Truck(s) Selected Number of Trucks: 1 Truck(s) <br /> Adjusted hourly truck team production: 34.86 LCY/Hour <br /> Adjusted single truck/loader team production: 34.86 LCY/Hour <br /> Adjusted multiple truck/loader team production: 34.86 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 1.06 Hours <br /> Unit cost: $9.341 /LCY Total job cost: $346 <br /> CIRCES Cost Estimating Software <br />