Laserfiche WebLink
Demo Worksheet Cont'd Task#TTT Page 66 of 141 <br /> Pond primary spillway 24" Pipe, 120.00 LF $7.25 $870.48 <br /> corrugated <br /> metal(CMP)- <br /> 24 in.diameter <br /> pipe <br /> Pond emergency 36" Pipe, 120.00 LF $11.32 $1,358.16 <br /> spillway corrugated <br /> metal(CMP)- <br /> 36 in.diameter <br /> pipe <br /> Material and debris NA Loading and 2 200.00 CY $18.25 $3,650.00 <br /> removal mile haul,no <br /> salvage- <br /> Machine <br /> loading <br /> Remove/dispose of NA USER 1.00 EA $500.00 $500.00 <br /> signs and markers PROVIDED <br /> ITEM <br /> Total Cost <br /> Subtotal (adjusted for <br /> Job Hours: 140.00 (unadjusted): $330,359.12 location): $310,537.57 <br /> CIRCES Cost Estimating Software <br />