My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-21_BONDING - C1981035
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1981035
>
2022-11-21_BONDING - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2022 10:30:28 AM
Creation date
11/22/2022 8:30:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Bonding
Doc Date
11/21/2022
Doc Name Note
Cost Estimate
Doc Name
Reclamation Cost Estimate
From
DRMS
To
GCC Energy, LLC
Type & Sequence
RN8
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task#TTT Page 63 of 141 <br /> crushed coal storage 4x4 Demo.and on- 6.00 LF $12.64 $75.84 <br /> conveyor footers site disposal in <br /> excavated pit, <br /> 2.0 ft.x 3 ft. - <br /> Max.200 ft. <br /> push <br /> Coal Stack Tube#2 14.5xl2x25 Bldg.(MN) 4,350.00 CF $0.24 $1,026.60 <br /> Head House demo./on-site <br /> disposal in <br /> excavated pit- <br /> Max. 10,000 ft. <br /> haul <br /> Cross-Belt Coal 20x20 Demo.and on- 400.00 SF $1.05 $421.20 <br /> Sampler site disposal in <br /> excavated pit,6 <br /> in.thick-Max. <br /> 200 ft.push <br /> Truck Loadout 4x8x260 Conveyor, 4.23 EA $3,125.00 $13,218.75 <br /> Conveyor Horizontal Belt <br /> 24"Belt,61.5' <br /> Length <br /> Truck Loadout&Bins 30x15x30 Bldg.(MN) 13,500.00 CF $0.24 $3,186.00 <br /> demo./on-site <br /> disposal in <br /> excavated pit- <br /> Max. 10,000 ft. <br /> haul <br /> truck loadout&bins 6.5x3.5x4 Demo.and on- 273.00 SF $1.11 $301.94 <br /> slab site disposal in <br /> excavated pit, <br /> 12 in.thick- <br /> Max.200 ft. <br /> push <br /> truck loadout&bins 2x4 Demo. and on- 24.00 LF $12.64 $303.36 <br /> footers site disposal in <br /> excavated pit, <br /> 2.0 ft.x 3 ft. - <br /> Max.200 ft. <br /> push <br /> Truck scale 12Ox2Ox2 Bldg.(SN) 4,800.00 CF $0.22 $1,032.00 <br /> demo./on-site <br /> disposal in <br /> excavated pit- <br /> Max. 10,000 ft. <br /> haul <br /> truck scale slab l50x16 Demo. and on- 2,400.00 SF $1.11 $2,654.40 <br /> site disposal in <br /> excavated pit, <br /> 12 in.thick- <br /> Max.200 ft. <br /> push <br /> Coal sales building 20x12x10 Bldg.(SN) 2,400.00 CF $0.22 $516.00 <br /> demo./on-site <br /> disposal in <br /> excavated pit- <br /> Max. 10,000 ft. <br /> haul <br /> coal sales slab 20x12 Demo.and on- 240.00 SF $1.02 $245.04 <br /> site disposal in <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.