Laserfiche WebLink
Demo Worksheet Cont'd Task#TTT Page 52 of 141 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: King II-haul sediment from ponds to King I site <br /> Site: King Coal Mine Permit Action: RN8 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 065 State: Colorado Abbreviation: None <br /> Date: 5/5/2022 County: La Plata Filename: C035-065 <br /> User: JHB <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 12-18 cy,6x4 <br /> -Loader: CAT 938H <br /> Support Equipment-Load Area: NA <br /> -Dump Area: CAT 938H <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 NA 100 NA NA <br /> Ownership cost/hour: $27.72 $35.16 NA $35.16 NA NA <br /> Operating cost/hour: $47.23 $33.22 NA $33.22 NA NA <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. NA $0.00 NA $0.00 NA NA <br /> cost/hour: <br /> Ripper op.cost/hour: NA $0.00 NA $0.00 NA NA <br /> Operator cost/hour: $32.54 $40.71 NA $40.71 NA NA <br /> Unit Subtotals: $107.49 $109.09 NA $109.09 NA NA <br /> Number of Units: 6 1 0 1 0 0 <br /> Group Subtotals: Work: $754.03 Support: $109.09 Maint: $0.00 <br /> Total work team cost/hour: $863.12 <br /> MATERIAL QUANTITIES <br /> Initial volume: 6,453 CCY Swell factor: 1.000 <br /> Loose volume: 6,453 LCY <br /> Source of estimated volume: 2 pond cleanings,2 ac It each cleanout <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> CIRCES Cost Estimating Software <br />