My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-21_BONDING - C1981035
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1981035
>
2022-11-21_BONDING - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2022 10:30:28 AM
Creation date
11/22/2022 8:30:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Bonding
Doc Date
11/21/2022
Doc Name Note
Cost Estimate
Doc Name
Reclamation Cost Estimate
From
DRMS
To
GCC Energy, LLC
Type & Sequence
RN8
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task#TTT Page 43 of 141 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: King I&II-mobilize for rill and gully maintenance,X 3 <br /> Site: King Coal Mine Permit Action: RN8 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 051 State: Colorado Abbreviation: None <br /> Date: 5/5/2022 County: La Plata Filename: C035-051 <br /> User: JHB <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $21.28 $37.94 $47.67 <br /> Operating Cost/Hour: $26.55 $50.48 $56.21 <br /> Operator Cost/Hour: $20.54 $20.54 $20.54 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $68.37 $132.49 $147.95 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) fleet <br /> Cat D3K LGP-3P 9.20 $30.26 $68.37 3 $295.89 $205.11 $0.00 <br /> CAT 12M 16.01 $47.01 $68.37 3 $346.14 $205.11 $0.00 <br /> Subtotals: 1 $642.03 $410.22 $0.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Water Tanker,2,500 Gal. $29.70 3 $89.10 $89.10 <br /> Subtotals: $89.10 $89.10 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: DURANGO <br /> Total one-way travel distance: 20.00 miles <br /> Average Travel Speed: 40.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $4,904.43 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $89.10 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.