My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-16_PERMIT FILE - M2022047 (6)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022047
>
2022-11-16_PERMIT FILE - M2022047 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 2:47:09 PM
Creation date
11/16/2022 3:19:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022047
IBM Index Class Name
Permit File
Doc Date
11/16/2022
Doc Name
Application
From
Young Enterprises - Colorado Gators, Inc
To
DRMS
Email Name
CCW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
deposit will be mined three to six feet deep using loaders and haul trucks. Final depth will be <br /> determined by the configuration of each of the four recreation fields. Upon final excavation of <br /> each pit, the pit will be immediately reclaimed and converted to an athletic field. Thus, no more <br /> than one pit will be mined at a time. The groundwater table will not be encountered during <br /> mining as the water table is currently at least 15 feet below the surface in the permit area. <br /> Mining will progress as shown on Map C-2. All mining will be to final 3H:1V slopes on the <br /> perimeter. The active mining highwall will be mined to the final 3H:1 V mining slope. This means <br /> that at no point in the operations life will backfill be required for reclamation. The maximum <br /> disturbance at any time will be at the end of the mine life when the largest amount of rangeland <br /> requiring topsoil and revegetation is present. This worse-case scenario would be when one of <br /> the recreation fields is mined, but has not been reclaimed or converted to a recreation field. This <br /> worse-case scenario would also include the need to reclaim the soil storage area. This scenario <br /> will determine the bond calculation and is discussed in detail in Exhibit L. <br /> 1 .3. Equipment <br /> Table D-1 shows the type of equipment that will be used for the operations of this site. Once <br /> operations are complete, all equipment will be removed from the site. <br /> Mystic Soil <br /> October 2022 D'2 Lewicki&Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.