My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-19_PERMIT FILE - C1981018A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018
>
2022-10-19_PERMIT FILE - C1981018A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:40:38 PM
Creation date
11/14/2022 11:13:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
10/19/2022
Section_Exhibit Name
Section IV. Mine Surface Facilities Operations Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-74 (4/2022) IV-41 <br /> c. Sedimentation ponds hold runoff from disturbed areas a required length of time <br />(theoretical detention time) to allow most of the solids to settle out and release the <br />supernatant back into the natural drainage system. <br /> d. Rock check dams in areas otherwise hard to control. <br /> e. Rip-rap lined ditches. <br /> f. Use of a chemical flocculent such as Nalco Enact 7888 or equivalent for decreasing <br />settling time in sediment ponds. <br /> <br />In the "D" Portal Area, special washdown facilities in and around the preparation plant are provided <br />for areas where significant amounts of fine coal dust might accumulate. Water from plant <br />operations which gets into these areas is collected in sumps and pumped to the process water <br />settling pond. This water is then used in the makeup water cycle. Special attention is given to <br />water containing significant amounts of coal fines as the water might have characteristics more <br />objectionable and more difficult to treat than would runoff from other disturbed areas. <br /> <br />Sediment control systems along the conveyor consist of ditches and berms to return runoff to a <br />natural drainage area. Culverts are also used for controlling drainage. Two ponds are used at the <br />slot storage area (SS-1 and SS-2). Ditches, berms, and culverts direct runoff from the top of the <br />slot area into SS-1. Diversion ditches direct runoff from a disturbed laydown area on the west side <br />of the slot storage area to SS-2. <br /> <br />The sedimentation and drainage control system used in the Refuse Disposal Area are slightly <br />different as shown on Maps 76, 77, 77A, 78, 79, 80, 80A, 162, and 165. The watershed of a <br />sub-area is progressively disturbed as the sub-area is filled with refuse. During this process, runoff <br />from undisturbed areas is diverted away from disturbed areas by temporary ditches. The purpose <br />of these temporary ditches is to prevent excessive erosion of the refuse and not to prevent mixing <br />of runoff from disturbed areas. The perimeter diversion ditches into the sedimentation ponds carry <br />both runoffs. Both types of runoff are mixed. This is not considered detrimental as the watersheds <br />are small and the ponds are designed for the worst expected situations (i.e., when most of the <br />watershed is disturbed). Sediment design and diversion ditch calculations are given in Illustrations <br />I-4 for refuse area 1 and I-6A for refuse area 5A. With the approval of TR74 to combine refuse area <br />RP-2/3/4 and RP-5A into RP2/3/4/5, the sedimentation design and ditch calculations are given in <br />Illustration 61. The sedimentation and discharge design and ditch calculations for RP-A are <br />included in Illustration 59. Red Wash Pond will be utilized for water quality compliance. <br />Calculations are provided in Illustration 60. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.