My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-19_PERMIT FILE - C1981018A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018
>
2022-10-19_PERMIT FILE - C1981018A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:40:38 PM
Creation date
11/14/2022 11:13:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
10/19/2022
Section_Exhibit Name
Section IV. Mine Surface Facilities Operations Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-74 (4/2022) IV-33 <br />Rd 65 to its terminus at the cut slope above the bathhouse used for conveyor maintenance, (iv) the <br />alluvial road past the double gate to the wells, (v) the road to the north of the slot storage bench and <br />(vi) the road to the B-Vent shaft. These roads meet the requirements of Rule 4.03.3. <br /> <br />A light use road approximately 2410-feet long and 12-feet wide was constructed from the existing <br />Deserado Mine Haul Road to the B-Vent Shaft (Maps 151 and 152). Similarly, 6000’ of light use <br />roads connect County Rd 65, RDH-3, SH-1, SH-2, and B-Vent Shaft #2 to the haul road. These <br />light use roads are graveled to allow all weather access to these sites (Map 155). <br /> <br />Construction specifications were in accordance with applicable sections of the regulatory agency <br />design criteria listed above. Each construction contract document bound the contractor to the <br />applicable sections of the regulatory documents pertaining to construction. The initial construction <br />activity consisted of clearing and grubbing all woody vegetation from the construction right-of-way. <br />The material cleared and grubbed was piled in areas off the right-of-way so as to be useful habitat <br />in promoting wildlife. Next, topsoil was removed and stockpiled close to the access road and in <br />areas not affected by erosion. Such construction method will be followed for all roads except light <br />use roads where topsoil removal will not take place except as necessary per section 4.03.3(3)(f). <br /> <br />The stockpile locations and volumes are shown on the plan and profile drawings. Following <br />removal of woody materials and topsoil, grading operations for cut and fill sections started for the <br />road and conveyors. Culverts were installed and bedded in low areas along the slope of the <br />existing drain channel. Additional culverts to satisfy grade requirements were installed during this <br />operation, with proper collection drains on the downstream side leading to natural drainage basins. <br />Runoff calculations are discussed in another section of this permit application. <br /> <br />After the grading was completed, the drainage ditches were installed, surface of the roadway <br />graveled and cut and fill sections topsoiled with the material taken from the stockpile. During all the <br />above operations, the design engineer's construction inspectors monitored the work to assure <br />compliance with all regulatory agency requirements. Soils test for compaction and gradation were a <br />part of the inspection activity. Access and maintenance roads are maintained by periodic regrading <br />of the gravel surface and regraveling as required. Ditches and culverts are cleared periodically to <br />assure proper drainage. Since the maintenance road receives very little traffic, dust control is not <br />used. The access road surface is watered and treated as required for dust control. <br /> <br />Culverts and ditches were designed as discussed in Section IV.D.2. Drainage areas for culverts <br />and ditches are shown on Maps 23, 86, 162, and 165. Construction methods were similar to that <br />discussed for the haul road. Only authorized personnel use the access road to the explosives <br />storage area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.