My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-19_PERMIT FILE - C1981018A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018
>
2022-10-19_PERMIT FILE - C1981018A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:40:38 PM
Creation date
11/14/2022 11:13:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
10/19/2022
Section_Exhibit Name
Section IV. Mine Surface Facilities Operations Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-74 (4/2022) IV-17 <br />monitoring activities. Existing avenues of communication and cooperation between BME and <br />federal/state agencies is considered adequate for the continued protection of this species. <br />Reclamation will be started as soon as the refuse is brought to final grade in the area being worked. <br /> The layout of the Refuse Disposal Area is indicated on Map 76. The sub-areas that are already <br />constructed or are in use are shown in greater detail on Map 77, Map 77A and Map 150. <br /> <br />Additionally, two temporary storage areas will be utilized. Area #1 (Map 25) will be used for rotary <br />breaker rock refuse storage pile and Area #2 (Map 26 & 27) for coal and/or coal refuse. Area #1 <br />will contain a maximum of 8,000 tons of material at any on time. Quantities of material stored in <br />Area #2 are limited to that shown in Section IV.C.4. <br /> <br />Prior to actual disposal in the refuse disposal areas, an access road from the haul road will be <br />constructed to the lower portion of the areas and the sedimentation ponds and lower parts of the <br />diversion ditches will be placed. Topsoil from the pond areas will be placed in the topsoil storage <br />pile and all fill material not required for embankment construction will be placed in the nontoxic fill <br />storage pile. Trees and brush will be removed and the topsoil will be stripped and placed in the <br />topsoil storage pile or on a refuse area being reclaimed. The topsoil storage pile will be mulched <br />and seeded. After the topsoil is removed, enough nontoxic fill to meet the minimum cover depth <br />requirement of 30 inches (as per DRMS's approval) will be removed and placed in the nontoxic fill <br />storage pile or on a refuse area being reclaimed. BME will document topsoil/cover soil material <br />balance as future refuse area development and reclamation progresses. <br /> <br />The nontoxic storage piles will be stabilized and seeded to minimize erosion. The nontoxic fill in the <br />storage pile will normally be used for reclamation of the sub-area where removed, but may be <br />utilized on another sub-area if preceding area has been reclaimed during construction of a <br />subsequent sub-area or to help balance excess and deficient subsoil quantities between piles. The <br />topsoil thickness versus area information is given in Appendix IVA. <br /> <br />To minimize the area occupied by the topsoil and nontoxic fill (subsoil) stockpiles the face slopes <br />were set at 3h:1v and 2h:1v, respectively. Since these are relatively steep slopes, the faces of both <br />stockpiles will be roughened or furrowed on the contour prior to reseeding. <br /> <br />A sediment ditch is constructed around the base of both topsoil and subsoil stockpiles. An earthen <br />berm with a rock filter at the low point is installed at the toe of the subsoil pile to drain the runoff <br />collected from precipitation events. The ditches are cleaned as required to maintain their required <br />cross section. See Maps 77. <br /> <br />The procedure followed for Sub-areas RP-1, 2/3 and 4 was repeated for Sub-area 5A. Light utility <br />roads were constructed along the west and east sides of Refuse Area 4 and 5 in order to maintain <br />lights on the power lines. A dozer access crossing was constructed between RP-4 and RP-5A. <br />