Laserfiche WebLink
SUBSOIL RPA <br />(2.9 DISTURBED ACRES) <br />TOPSOIL RPA <br />27.9 ACRE-FEET <br />(2.95 DISTURBED ACRES) <br />SUBSOIL RPA <br />56.7 ACRE-FEET <br />TOPSOIL RPA <br />30.1 ACRE-FEET <br />TOPSOIL 5A <br />63.56 ACRE-FEET <br />6 <br />SUBSOIL 4 <br />26.62 ACRE-FEET <br />5 <br />TOPSOIL 4 <br />42.05 ACRE-FEET <br />4 <br />SUBSOIL 2-3 <br />58.99 ACRE-FEET <br />3 <br />SUBSOIL 2-3 <br />49.41 ACRE-FEET <br />2 <br />TOPSOIL 2-3 <br />25.8 ACRE-FEET <br />1 <br />8 <br />9 <br />10 <br />11 <br />SUBSOIL 5A <br />97.59 ACRE-FEET <br />7 <br />RP-A <br />16.52 ACRE-FEET <br />RP-1 <br />(RECLAIMED) <br />(95.70 DISTURBED ACRES) <br />RP-2345 <br />(109.32 DISTURBED ACRES) <br />HAUL <br />R <br />O <br />A <br />D <br />LEGEND <br />DISTURBED AREA TO BE RECLAIMED <br />PILE DESIGN MAJOR CONTOURS (25' INTERVAL) <br />PILE DESIGN MINOR CONTOURS (5' INTERVAL) <br />EXISTING GROUND MAJOR CONTOURS (25' INTERVAL) <br />EXISTING GROUND MINOR CONTOURS (5' INTERVAL) <br />NEW DISTURBED AREA (5.83 ACRES)JLT4/13/22O:\Engineering Projects\Refuse Area 2345\Drawings\Map 166 Soil Stockpile Inventory.dwgBLUE MOUNTAIN ENERGY, INC.DESERADO MINE3607 COUNTY ROAD 65RANGELY, CO 81648MAP 166REFUSE PILE SOIL STOCKPILE INVENTORY1"=400'1NARRATIVEÍ— <br />DURING THE STOCKPILING OF SOIL FOR THE RP-1-5 AREAS, THE DEPTH REQUIREMENT FOR RECLAMATION COVERAGE <br />WAS 48". THIS WORK WAS DONE PRIOR TO 2003 AS OUR AERIAL ORTHOPHOTO AND CONTOURS FROM THAT YEAR <br />SHOW THE SOIL STOCKPILES IN PLACE, RP-1 WAS RECLAIMED, AND RP-2-5 WERE ACTIVELY RECEIVING REFUSE. <br />AT SOME POINT, IT WAS DETERMINED THE TOPSOIL IS NOT SIGNIFICANTLY BETTER THAN THE SUBSOIL AND IS <br />INFESTED WITH INVASIVE CHEATGRASS. DURING RECLAMATION, THE TOPSOIL WAS DESIGNATED TO BE PLACED FIRST <br />WITH THE SUBSOIL PLACED ON TOP. THE TOTAL DEPTH REQUIREMENT WAS ALSO REDUCED TO 30". THIS REDUCTION <br />IN RECLAMATION DEPTH MEANT THERE WAS EXCESS MATERIAL IN THE SOIL STOCKPILES. <br />THE DEVELOPMENT OF THE RP-A AREA COINCIDED WITH AN UNEXPECTED CHANGE IN COAL PROCESSING WASTE <br />MOISTURE CONTENT. COAL WASTE SLURRY FROM THE BOTTOM OF THE CLARIFIER USED TO BE DISCHARGED INTO <br />THE OLD SEALED D SEAM MINE. THAT DISPOSAL AVENUE UNEXPECTEDLY ENDED AND THE HIGH MOISTURE MATERIAL <br />HAD TO BE ROUTED TO THE REFUSE PILES. THE HIGH MOISTURE MATERIAL HAS TO BE SPREAD OUT AND DRIED <br />BEFORE IT CAN BE PROPERLY COMPACTED. <br />DURING THE WINTER, THE HIGH MOISTURE MATERIAL PRESENTS A UNIQUE PROBLEM. PROPER COMPACTION <br />CANNOT HAPPEN DURING FREEZING TEMPERATURES. FURTHERMORE, THE WET MATERIAL DOES NOT DRY OUT UNTIL <br />LATE SPRING. THE WET MATERIAL CANNOT BE STOCKPILED BECAUSE IT SPREADS OUT. RATHER THAN ONE LARGE <br />STOCKPILE, THE WET MATERIAL IS BEST HANDLED BY PLACING IT IN SPACED OUT ROWS UNTIL SPRING WHEN THE <br />ROWS CAN BE PUSHED, DRIED OUT, AND COMPACTED. THIS REQUIRES A SIGNIFICANT AMOUNT OF SURFACE AREA. <br />FORTUNATELY, RP-A HAD BEEN APPROVED JUST BEFORE THIS NEW AREA-INTENSIVE WASTE HANDLING PROCESS <br />BECAME NECESSARY. KNOWING THERE WAS EXTRA STOCKPILED SOIL AVAILABLE, THE AMOUNT OF TOPSOIL AND <br />SUBSOIL REMOVED FROM RP-A WAS REDUCED IN ORDER TO SPEED DEVELOPMENT AND MAKE MUCH NEEDED <br />STOCKPILING AND DRYING AREA AVAILABLE AS QUICKLY AS POSSIBLE. ALSO, THE ACTUAL AMOUNT OF TOPSOIL <br />EXCAVATED WAS DEEMED LESS IMPORTANT AS IT IS PLACED BELOW THE SUBSOIL UPON RECLAMATION. <br />THE PURPOSE OF THIS MAP IS TO DOCUMENT THE STOCKPILED SOIL VOLUMES AND REQUIREMENTS. OLD STOCKPILE <br />VOLUMES WERE TABULATED BEFORE 2003, BUT CLOSER INSPECTION REVEALED INCONSISTENCIES AND NO EVIDENCE <br />OF HOW THOSE VOLUMES HAD BEEN CALCULATED COULD BE LOCATED. RATHER THAN RELYING ON SUSPECT <br />VOLUME TABULATIONS, THE ORIGINAL EXISTING GROUND CONTOURS FROM A 1979 AERIAL SURVEY WERE DIGITIZED <br />AND ADJUSTED FOR DATUM DISCREPANCIES. ACCURATE VOLUMES FOR THE STOCKPILES FROM RP1-5 WERE THEN <br />CALCULATED. <br />COMBINING RP 2-3,4, AND 5 WILL REQUIRE ADDITIONAL STOCKPILING TO COVER AN ADDITIONAL 5.83 ACRES. <br />ADDITIONALLY, THE EXCESS FROM THE OLD STOCKPILES ALONG WITH THE COMPLETED STOCKPILE VOLUMES FROM <br />THE RP-A AREA ARE 2.5 ACRE FEET SHORT. THE TOTAL ADDITIONAL VOLUME TO BE STOCKPILED IS 17.07 ACRE-FEET. <br />THIS VOLUME WILL PRIMARILY COME FROM THE AREA BETWEEN RP-234 AND RP-5. BECAUSE THIS AREA HAS SOME <br />ROCKY KNOLLS, IT MAY BE MORE COST EFFECTIVE TO PUSH SOME OF THE REFUSE OFF THE UPPER AREAS OF RP-A <br />AND TAKE MORE SUBSOIL FROM THERE. SOIL TAKEN FROM FROM RP-A WILL BE STOCKPILED IN PILES 10 AND 11 <br />SHOWN HEREON WITHOUT A NEED TO INCREASE DISTURBED AREA. SOIL TAKEN FROM BETWEEN RP-234 AND 5 WILL <br />BE PLACED ON PILES 6 AND 7 SHOWN HEREON ALSO WITHOUT INCREASING THE DISTURBED AREA FOR THE <br />STOCKPILES. <br />MAP 166 <br />N <br />S <br />EW