Laserfiche WebLink
TABLE A <br />MONITORING SITES & FREQUENCY <br />SURFACE FLOW MARCH - MAY <br />REGULAR SAMPLING <br />CONTINGENT SAMPLING <br />(sample only when pumping site 109 or <br />115 is discharging, between 24 hours <br />after the discharge begins and 36 hours <br />after it ends) <br />SITE WATER LEVEL & FIELD PARAMETERS <br />WATER <br />QUALITY (see <br />note, below) <br />WATER <br />LEVEL & <br />FIELD EC <br />LAB SULFATE <br />& LAB EC <br />Foidel Creek <br />USGS 09243800 Schedule A Once in March <br />8 Schedule A Once in March <br />14 Schedule A Once in March <br />USGS 09243900 Schedule A Once in March <br />Fish Creek <br />16A Schedule A Once in March Weekly <br />302 <br />27A Schedule A Once in March <br />1003 Schedule A Once in March Weekly Monthly <br />SW-13 Quarterly - Flow only, fields semi-annually semi-annually <br />SW-14 Quarterly - Flow only, fields semi-annually semi-annually <br />SW-15 Quarterly - Flow only, fields semi-annually semi-annually <br />307 Monthly - Flow only, fields semi-annually <br />305 Monthly - Flow only, fields semi-annually <br />Trout Creek <br />301 Monthly Once in March Weekly Monthly <br />69 Monthly Once in March Weekly Monthly <br />1005 Monthly Once in March Weekly Monthly <br />Middle Creek <br />29 Schedule A Once in March Weekly Monthly <br />Schedule A <br />March - Monthly <br />April - Two times during month <br />May - Monthly <br />Note:If site is frozen, March quality sample may be taken in April. <br />MR22-322 Exhibit 14-7 10/14/2022