Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: Trapper Mine Permit Action: TR132 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 10/4/2022 County: Moffat Filename: COIO-000 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 090 Replace Topsoil I/J Pit Spoil Dump SCRAPERI 1 7.80 $18,678 <br /> 105 Seed I/J Spoil Dump and Walk Rd below 6700 REVEGE 1 27.00 $16,593 <br /> elev <br /> NO2 Topsoil Walk Road TRUCKI 1 66.80 $119,842 <br /> NO2A Topsoil Walk Road TRUCKI 1 66.80 $119,842 <br /> SUBTOTALS: 168.4 $274,955 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $5,554 <br /> Performance bond: 1.05 Total= $2,887 <br /> Job superintendent: 50.73 Total= $3,811 <br /> Profit: 10.00 Total= $27,496 <br /> TOTAL O&P= $39,748 <br /> CONTRACT AMOUNT(direct+O&P)_ $314,703 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 7.22 Total= $22,722 <br /> Reclamation management and/or administration: 5.30 $16,679 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $79,649 <br /> TOTAL BOND AMOUNT(direct+indirect)_ $354,604 <br />