Laserfiche WebLink
EXHIBIT L-REClAMATON COST <br /> STILES Mq111NG RESOURCE <br /> The largest one time exposure is reclamation of the top soil and overburden strip area of mine blocks 1A. <br /> Item Task Description Units Unit Unit Cost Extension <br /> 1 Top soil 10,900 cy $15 $163,500 <br /> 2 Overbuden 104,000 cy $3 $312,000 <br /> 3 Seed Drill-Native Grass Seed Mix-14 pls/ac 30.6 Ac $11500 $45,900 <br /> 4 Seed Drill-Native Forb Seed Mix-4.5 pis/ac 30.6 Ac $1,100 $33,660 <br /> 5 Mukh-Native Grass,Weed Free 30.6 Ac $1,200 $36,720 <br /> 6 tlis-Herbicide and amendments 30.6 Ac $170 $5,202 <br /> a Told Direct forts $5�. <br /> INDIRECTCOSTS <br /> Item Task Description Units Unit Extension <br /> 5 Contractor Mobilization 5% % %of Total $29,949 <br /> 6 Overhead/Administration 10% % Direct Cost $59'699 <br /> 7 Administration 5% % $29,949 <br /> a Profit is 10%of Direct Costs 10% % $59,698 <br /> 13 Total Overhead and Profit $179,095 <br /> 14 CoetradAnew* Costs Phis Overhead and ftMq $7XA77 <br /> ADLUPRSMTM AND CONTINGEHCY <br /> Rem TaADescription Units Unit %of Extension <br /> 15 Administration(Engineering,contract and management) 5% % Contract $38,804 <br /> 16 Conti 10% % Amount $77,608 <br /> 17 IOTALRIBGAMNIM BOND AMOUNT $as2,M <br /> Rene Task Description Units Unit link Cost Extension <br /> 13 Bedwastion Bond Amount$Per Acre 30.6 S/Ac $29. 66 $892,488I <br />