My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-03_PERMIT FILE - M2021067
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021067
>
2022-11-03_PERMIT FILE - M2021067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 8:32:03 PM
Creation date
11/10/2022 2:17:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021067
IBM Index Class Name
Permit File
Doc Date
11/3/2022
Doc Name
Adequacy Review Response
From
Asphalt Specialties Co.
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Stiles Mining Resource <br /> Groundwater Monitoring and Mitigation Plan <br /> November 2022 <br /> Page 6 <br /> 3.7.2 Evaluation of Existing Data Set <br /> If confirmation sampling results confirm parameter exceedance(s) in POC well(s), ASCI will <br /> evaluate the existing data set (i.e., most recent and historic sample results, potentiometric flow <br /> maps, etc.) within thirty (30) days to try and determine if adverse impacts are potentially sourced <br /> from the mine or from an off-site source.Data will specifically be reviewed for the concentration(s) <br /> of the exceeding parameter(s) reported in up-gradient monitoring wells to identify current or past <br /> exceedance(s), elevated concentration(s), and/or any identifiable trends. If appropriate (i.e., <br /> exceedance only slightly exceeds benchmark value),ASCI may conduct a statistical trend analysis <br /> to determine: 1) if exceedances are statistically significant increases over background; and/or 2) if <br /> a new site-specific comparison benchmark is appropriate. <br /> ■ If exceedance(s) are not potentially attributable to the mining operation and/or are not <br /> determined to be a statistically significant increase, ASCI will provide DRMS a summary <br /> of the evaluation conducted and coordinate the appropriate path forward(e.g., continue <br /> with the current groundwater quality monitoring program schedule, submit Technical <br /> Revision to change site-specific groundwater quality benchmark, etc.). <br /> ■ If exceedance(s) are potentially attributable to the mining operation and/or are <br /> determined to be a statistically significant increase, ASCI will notify DRMS and any <br /> down-gradient adjacent well owners within 600-feet of the potential off-site impacts to <br /> groundwater and implement POC Well Exceedance Groundwater Quality Monitoring as <br /> detailed in Section 3.7.3. <br /> 3.7.3 POC Well Exceedance Groundwater Quality Monitoring <br /> As no chemical treatment or other processes which could potentially introduce contaminants to <br /> groundwater are used as part of the mining process,it is likely any exceedance(s)due to the mining <br /> operation would be from a naturally occurring source (e.g., underlying bedrock) and only be <br /> temporary. The POC Well Exceedance groundwater monitoring schedule will consist of quarterly <br /> sampling events for all site monitoring wells(MW-1 through MW-7)with the first event beginning <br /> in the following quarter from when the initial exceedance(s)were detected. Quarterly monitoring <br /> will continue until two (2) consecutive quarters of POC Well Exceedance monitoring data <br /> indicates that results for the previously exceeding parameter(s) are at or below site-specific <br /> groundwater quality benchmark value(s) in POC wells. ASCI will offer to sample down-gradient <br /> adjacent well owner wells within 600-feet wells at no cost to them during each sampling event for <br /> this period. Once two(2) consecutive quarters of groundwater monitoring indicate results are at or <br /> below site-specific groundwater quality benchmark value(s), ASCI will submit results to DRMS <br /> and return to the current groundwater monitoring schedule. If exceedances are reported in POC <br /> well(s) for parameter(s) in two (2) consecutive quarters of POC Well Exceedance monitoring, <br /> ASCI will work with DRMS and down-gradient adjacent well owners within 600-feet to determine <br /> if additional assessment and/or potential corrective action measures, as detailed in Section 3.7.4, <br /> are necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.