Stiles Mining Resource <br /> Groundwater Monitoring and Mitigation Plan <br /> November 2022 <br /> Page 2 <br /> Monitoring wells were installed to a depth slightly above the top of bedrock encountered. <br /> Monitoring wells are constructed of two (2)-inch diameter Schedule 40 PVC with factory slotted <br /> 0.010" slot size for the screened portions. The filter packs consist of 10/20 silica sand and extend <br /> approximately two (2)-feet above the top of the well screen. A bentonite seal (chips)was installed <br /> from the top of the filter pack to ground surface. At the surface, a two (2)-foot x two (2)-foot <br /> concrete pad was installed around each well along with a four(4)-inch square steel well cover with <br /> hinged locking cap to protect the above ground riser. Copies of the monitoring well construction <br /> logs are provided in Appendix A. <br /> Three (3) of the monitoring wells (MW-1, MW-2, and MW-3) are located hydraulically up- <br /> gradient along the western and southern boundaries of the property owned by Hunt Brothers <br /> Properties (HBP)which includes proposed mining operation. Three(3)monitoring wells (MW-4, <br /> MW-5, and MW-6) are located hydraulically down-gradient along the northern and eastern <br /> boundaries of the HBP property. The down-gradient wells (MW-4 through MW-6) will serve as <br /> the designated "Points of Compliance" (POC) wells in accordance with Rule 3.1.7(6)(b)(ii)(A). <br /> The location of the monitoring wells are shown on Figure 2. <br /> 3.2 GROUNDWATER SAMPLING EVENT FREQUENCY AND SCHEDULE <br /> ASCI will conduct five(5)consecutive quarters of groundwater sampling to document background <br /> groundwater quality conditions at the Site prior to commencing mining operations (Pre- <br /> Operational Background Sampling). After mining operations begin, ASCI will conduct quarterly <br /> monitoring (i.e., current groundwater quality monitoring schedule) for a minimum of four (4) <br /> consecutive quarters(Post-Operational Sampling).Any change to the current groundwater quality <br /> monitoring schedule (i.e., reduction in sampling frequency) will be submitted to DRMS via <br /> Technical Revision for approval prior to implementing. The following table outlines the <br /> anticipated groundwater quality schedule through four(4) quarters of post-operational sampling. <br /> Time Period Activities Conducted <br /> 2022 <br /> 1 st Quarter Correspondence with DRMS on groundwater quality requirements (e.g., <br /> (January- March) parameters,frequency, etc.)and agreement for monitoring well locations. <br /> Installation of Monitoring Wells <br /> Conduct 1 st Quarter Pre-Operational Background Groundwater Sampling Event <br /> 2nd Quarter Conduct 2nd Quarter Pre-Operational Background Groundwater Sampling Event <br /> (April- June) <br /> 3rd Quarter Conduct 3rd Quarter Pre-Operational Background Groundwater Sampling Event <br /> (July- September) <br /> 4th Quarter Conduct 4th Quarter Pre-Operational Background Groundwater Sampling Event <br /> (October-December) <br />