My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-03_PERMIT FILE - M2021067
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021067
>
2022-11-03_PERMIT FILE - M2021067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 8:32:03 PM
Creation date
11/10/2022 2:17:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021067
IBM Index Class Name
Permit File
Doc Date
11/3/2022
Doc Name
Adequacy Review Response
From
Asphalt Specialties Co.
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit E—Reclamation Plan <br /> SOUTH PLATTE RIVER <br /> Parcel III <br /> Mine Phase 3 l,� <br /> Mine Block jp i ,I` <br /> Dkedlon <br /> of MMft °C <br /> 0 0 <br /> � V <br /> W W <br /> W <br /> --——————— a NO MINING ` <br /> s <br /> y THIS AREA o NO MINING <br /> Z `• THIS AREA <br /> a r <br /> W <br /> Ph 3 6LK� Q <br /> 2 <br /> �I <br /> Commerc.al <br /> Asphalt'Ict Plan: pa <br /> t Recyde - f' STILES MINING RESOURCE <br /> operation % Mine Phase,Mine Block and <br /> Mining Direction <br /> s Revision 10/18/2022 <br /> Y <br /> 1) Asphalt Specialties will use procedures that minimize area disruption by our mining operation. <br /> Reclamation is achieved by the establishment of native grass and forbs; stabilization of soil and <br /> protection of the area water resources that provide for the beneficial use of the affected lands. <br /> 2) Project reclamation will return this site to usable property, by using inert material to fill the mined <br /> areas.The site reclamation plan calls for phased reclamation, with reclamation phase 1 continuing <br /> from north to south. Reclamation phase areas will be±15.3 acres. Reclamation will include the <br /> placement and seeding of cover material over fill areas, except for the permanent road to the 35th <br /> Avenue right of way. <br /> 3) The Stiles Mining Resource permit and affected area is 31.7 acres which includes the access road <br /> across Hunt Brother Property. The active minable area is±23.3 acres consisting of one mine phase <br /> with two mine blocks.The affected mining area at one time is±15.3 acres and the total mine buffer <br /> area is±7.2 acres. <br /> 4) The time to complete the mining of phase 1 about 16 years. Maximum production is expected to be <br /> ±300,000 tons per year. Final reclamation is expected to be complete in ±16 years. Due to market <br /> and economic considerations, mining could progress faster or slower than expected, which will <br /> adjust the time for mining and reclamation of the site. <br /> 5) Use -The property at one time was worked as an irrigated farm. The prior property owners use for <br /> the land was a livestock and dry land grazing operation.The dominant land uses surrounding the <br /> property includes water recharge to the west; oil and gas in the area, recreation along the river, <br /> H:\Pits HBP Plants\EVANS\Evans Mining Resource\DRMS Adequacy Revisions\Exh E Rec Plan REV 101822.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.