Laserfiche WebLink
27-34, T12S, R90W; Sections 25-27 and 34-36, T12S, R91W; Sections 6 and 7, T13S, R89W; <br /> Sections 1-12 and 17,T13S, R90W; Sections 1-3 and 11-13,T3 S, R91W;all within the 6a'PM. <br /> OXBOW MINING LLC: Phase III (SL-08)Site Eligibility 2021 and 2022 <br /> Location/Site Post-Mining Land Area Reclamation Date <br /> Use <br /> GVB-LW8-03 U/L 0.16 2010 <br /> GVB-LW9-05 pad plus 1300'road U/L 1.15 2012 <br /> GVB-LW10-05 pad plus 896' road U/L 0.79 2012 <br /> GVB-LW12-03 -2013' road U/L 0.83 2012 <br /> GVB-LW15-02,01A,01B pad U/L 1.77 2012 <br /> GVB-LW15-08 pad+200' road U/L 0.91 2012 <br /> GVB-LW17-01AB pad+319' road U/L 1.09 2012 <br /> GVB-LW17-03 pad+500' road U/L 0.86 2012 <br /> GVB-LW17-04,04B,04C U/L 0.96 2012 <br /> GVB-LW17-09 pad U/L 0.98 2012 <br /> Total Eligible Acreage 9.50 <br /> Post-Minng Land Uses <br /> U/L Undeveloped Land Sites where road is to be left per landowner request <br /> Map: Map 2.05-M1 (General Facilities and Gob Vent Boreholes sheets) contained in the <br /> mining and reclamation plan permit document identifies the areas requested for bond and <br /> liability release. <br /> Dates of Reclamation Work: Reclamation work was completed in the areas requested <br /> for release during 2010 or 2012 by OMLLC. Documentation of reclamation work is <br /> included in Exhibit 2.04-E3 of the permit document. <br /> Description of Bond Release Amount Request: The subject of the bond release is the <br /> final release from liability and release and return of the remaining reclamation bond for <br /> areas where it has been demonstrated that OMLLC has completed all reclamation <br /> obligations and successfully met the final revegetation success criteria. <br /> The reclaimed areas requested for release are in conformance with the approved post- <br /> mining land use(s)which have been implemented. Remaining reclamation at the mine site <br /> includes any required repair to reclaimed areas due to minor surficial erosion,weed control, <br /> and maintenance. All mining related disturbance has been reclaimed in accordance with <br /> the approved reclamation permit. The reclaimed areas requested for release do not require <br /> rill or gully repairs and have been treated to remove noxious weeds. <br /> Protection of the Hydrologic Balance: Annual Hydrology Reports (AHR) have been <br /> submitted annually for the mine and the information within the AHR's has demonstrated <br /> the continued protection of the hydrologic balance at the mine site and off-site. Self- <br /> monitoring of the sediment control system has been continual, and where regular <br /> inspections have revealed concerns with protection of the hydrologic balance, protection <br /> measures have been implemented and maintained. <br />