Laserfiche WebLink
Legal Description of the Area Requested for Bond Release: The following table, West <br /> Elk Mine Phase III (2"d Year) Eligible Areas: 2022 presents the locations or sites to be <br /> considered for bond release under this application. The reclaimed areas requesting bond <br /> release are located within the current permit area and are found within Sections 14, 22,23, <br /> 26, and 27, T13S, R90 W, all within the 6th Prime Meridian, Gunnison County, Colorado. <br /> WEST ELK MINE PHASE III (2"d Year) ELIGIBLE AREAS: 2022 <br /> Year <br /> Site Name/Number Area Acres Reclaimed % of Total <br /> Road to 24HG2E5XC, 4-5XC, 3XC Sylvester Gulch 1.57 2007 17.0% <br /> 1-21-38, 2-21-37, 3-21-36, 4-21-32 W. Bench 1.23 2008 13.3% <br /> 24-06&24-07&road W. Bench Rd. 0.94 2006 10.2% <br /> 19-04&19-05&shared spur road W. Bench 0.91 2008 9.8% <br /> 24HG2E5XC, 24HG1E4-5XC, 24HG1E3XC Sylvester Gulch 0.90 2007 9.7% <br /> 17-08A&B Saddle Rd. 0.82 1 2006 8.9% <br /> 20-01A(and Exploration Hole AAA) W. Bench 0.69 2007 7.5% <br /> 15-05 Saddle Rd. 0.62 2004 6.7% <br /> 20-31 W. Bench 0.58 2008 6.3% <br /> 22-04 W. Bench Rd. 0.52 2007 5.6% <br /> 15-06 Sylvester GI. Rd. 0.24 2004 2.6% <br /> 23HG1E3XC, 23HG3E3XC Shaft Cyn Rd. 0.13 2007 1.4% <br /> 24-09 Shaft Cyn Rd. 0.10 2008 1.1% <br /> rotal Phase III Eligible(2nd year) Reclaimed Sites 9.25 100.0% <br /> Map: Figure 1. (MCC Reclamation) contained in the mining and reclamation plan permit <br /> document identifies the areas requested for bond and liability release. <br /> Dates of Reclamation Work: Reclamation work was completed in the areas requested <br /> for release between 2004 and 2008 by MCC. Documentation of reclamation work is <br /> included within the permit document and CDRMS files. <br /> Description of Bond Release Amount Request: This bond release application <br /> requests release of bond and liability for successfully establishing vegetation <br /> supporting the post-mining land use, meeting the approved success standards for <br /> vegetation cover,herbaceous production,and species composition and completing all <br /> required reclamation for the reclamation areas identified in this bond release <br /> request. <br /> The areas requested for release are in conformance with the approved post-mining land <br /> use(s)which have been implemented. All mining related disturbance has been reclaimed <br /> in accordance with the approved reclamation permit. <br /> Protection of the Hydrologic Balance: Annual Hydrology Reports (AHR) have been <br /> submitted annually for the mine and the information within the AHR's has demonstrated <br /> the continued protection of the hydrologic balance at the mine site and off-site. Self- <br /> monitoring of the sediment control system has been continual, and where regular <br /> inspections have revealed concerns with protection of the hydrologic balance, protection <br /> measures have been implemented and maintained. <br /> Notice to Parties Identified in Rule 3.03.2(1): Potentially affected parties, Gunnison and <br /> Delta Counties, and governmental agencies as specified in CDRMS Rule 3.03.2(1) were <br /> Mountain Coal Company West Elk Mine Page 2 <br /> 2022 Phase III Bond Release Request Synopsis (SL-17) <br />