Laserfiche WebLink
TABLE OF CONTENTS <br /> Paae <br /> 1.0 INTRODUCTION.............................................................................................................................................1 <br /> 2.0 AREA GEOLOGY............................................................................................................................................1 <br /> 3.0 SITE GEOLOGY..............................................................................................................................................1 <br /> 4.0 EXISTING GROUNDWATER CONDITIONS...................................................................................................2 <br /> 5.0 GROUNDWATER MODEL..............................................................................................................................3 <br /> 5.1 Regional Topography........................................................................................................................3 <br /> 5.2 Bedrock Surface................................................................................................................................3 <br /> 5.3 Hydraulic Conductivity.......................................................................................................................4 <br /> 5.4 Specific Yield.....................................................................................................................................4 <br /> 5.5 Boundary Conditions.........................................................................................................................4 <br /> 5.6 Internal Influences.............................................................................................................................5 <br /> 6.0 MODEL SIMULATIONS...................................................................................................................................6 <br /> 6.1 Existing Conditions............................................................................................................................6 <br /> 6.2 Slurry Wall Installation.......................................................................................................................7 <br /> 6.2.1 Monarch Mountain Minerals and Aggregates Site Impacts......................................................8 <br /> 6.3 Mitigation Alternatives.......................................................................................................................9 <br /> 6.3.1 Phase 1 Mitigation..................................................................................................................10 <br /> 6.3.2 Phase 2 Mitigation..................................................................................................................11 <br /> 6.3.3 Mitigation With Recharge.......................................................................................................12 <br /> 7.0 CONCLUSIONS............................................................................................................................................13 <br /> 8.0 BIBLIOGRAPHY............................................................................................................................................13 <br /> Tables <br /> Table1 Boundary Conditions.......................................................................................................................................5 <br /> Table 2 Measured and Modeled Site Groundwater Levels...........................................................................................7 <br /> Table 3 Mining Groundwater Level Table (Slurry Walls In-Place)................................................................................8 <br /> Table 3aMining Groundwater Level Table with Monarch DENM Site............................................................................9 <br /> Table 4 Base Model and Modeled Site Groundwater Level After Cell 3 Slurry Wall...................................................10 <br /> Table 5 Base Model and Modeled Site Groundwater Level After Cell 3,and 4 Slurry Walls......................................11 <br /> Table 6 Base Model and Modeled Site Groundwater Level After Full Buildout at Both Sites.....................................12 <br /> Groundwater Model Report—Section 20 Gravel Mine Site -ii- August 2022 <br />