My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-07_PERMIT FILE - M2022001 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022001
>
2022-11-07_PERMIT FILE - M2022001 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2022 8:57:06 PM
Creation date
11/7/2022 1:44:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022001
IBM Index Class Name
Permit File
Doc Date
11/7/2022
Doc Name Note
Exhibit D - Mine Plan
Doc Name
Adequacy Review Response
From
Red Tierra Equities, LLC
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66.After the berm has been established the remaining segregated topsoil will be stockpiled in <br /> the northern portion of Cell 7. <br /> Overburden,clay and any other material that is uneconomical to sell will be stockpiled in the <br /> northern portion of Cell 7 to be used in Stage 2 slope reclamation. <br /> Stage 2-will consist of mining out Cell 3 in the north-east comer of the site. Mining will be <br /> completed in three(3)year long phases and will progress from west to east.Cell 3 will be a <br /> slurry wall lined cell and will be dry mined. The Infiltration Pond north of Cell 7 will be mined <br /> out concurrent with Cell 3. The Infiltration Pond will be mined to approximately 10 to 15 feet <br /> deep and will not encounter the water table. If the groundwater is encountered the area of the <br /> pit below the groundwater table will be filled with aggregate to approximately two(2)feet <br /> above the elevation where groundwater was encountered. <br /> Topsoil from this stage will be segregated and stockpiled in the northern portion of Cell 7. <br /> In the initial phase,overburden will be stockpiled existing stockpile in Cell 7. Once the first <br /> phase has been completely mined out, reclamation will begin on that phase and overburden <br /> material from the other phases will be placed directly in the reclamation slopes or sold. <br /> Stage 3—will consist of mining out Cell 4 and concurrently reclaiming Cell 3. Cell 4 contains <br /> three(3)approximately one(1)year phases. Cell 4 will be a slung wall lined cell and will be <br /> dry mined. Concurrent with Cell 4 slurry wall construction the southeast underdrain or series <br /> of dewatering wells will be constructed south of Cell 5S. Water from this area will be rerouted <br /> to the infiltration pond excavated in Stage 2 to mitigate the drop in groundwater elevation north <br /> of the site due to slurry wall construction. <br /> Topsoil from this stage will be segregate and stockpiled in the northern portion of Cell 7 as <br /> indicated on the map. <br /> Slope reclamation of the previous phases will be concurrent with mining. Overburden will be <br /> placed in the reclamation slope or stockpiled in the bottom of the pit next to the current <br /> reclamation phase. Excess overburden will be placed in the southwest comer of Cell 6 to fill in <br /> the future commercial area. <br /> Stage 4—will consist of mining out Cell 5 and concurrently reclaiming Cell 4. Cell 5 contains <br /> seven (7)approximately one(1)year phases. Cell 5 will be a slurry wall lined cell and will be <br /> dry mined. <br /> Topsoil from this stage will be segregate and stockpiled in the northern portion of Cell 7 as <br /> indicated on the map. <br /> Slope reclamation of the previous phases will be concurrent with mining. Overburden will be <br /> placed in the reclamation slope or stockpiled in the bottom of the pit next to the current <br /> reclamation phase. <br /> Stage 5—will consist of mining out Cell 6 and concurrently reclaiming Cell 5. Cell 6 contains <br /> four(4)approximately one(1)year phases. Cell 6 will be a slung wall lined cell and will be dry <br /> mined. The southwest underdrain will be constructed during the construction of the Cell 6 <br /> slurry wall. Water will be rerouted from the southern end of the site by the underdrain and <br /> piped to the Infiltration Pond to mitigate the groundwater shadow affect north of the site. <br /> Section 20—Gravel Mine—MLRB 112 Permit Amendment <br /> Exhibit D-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.