Laserfiche WebLink
17 <br /> i water in the Carey Pond? Sounds like you did. 1 A. The first thing we did was have the <br /> 2 A. Yes, there was water in the Carey Pond. 2 investigation done to deterimine where the -- how the <br /> 3 Q. Was any of that water being released 3 water was getting down into the abandoned workings. <br /> 4 from the pond for irrigation purposes? 4 Q. Okay. And who did you hire or task to <br /> 5 A. No, it was not. 5 to do that? <br /> 6 Q. Okay. Mr. Stark and Mr. Boulay 6 A. Well, there was an ERT through <br /> 7 indicated that they had concerns about the south portal 7 Huddleston-Berry. <br /> 8 and seepage from that. How did J.E. Stover coordinate 8 Q. Okay. <br /> 9 Snowcap's response to those concerns? 9 A. It was Flugro through Mike Berry. <br /> 10 A. Well, Snowcap was likely -- also 10 Q. Okay. And did you subsequently submit <br /> 11 concerned about the stability of the portal. So we got 11 the results of that initial investigation to DRIS? <br /> 12 in touch with ax ileston-Berry, Mike Berry, and had him 12 A. Yes, we did. <br /> 13 core out and report. 13 Q. All right. I'd like to have you look at <br /> 14 Q. Okay. Was there any ongoing 14 Exhibit A-30. I'm sorry. A-29, I think. No. A-30. <br /> 15 monitoring? 15 I apologize. Is this that submittal? <br /> 16 A. Yes. We were monitoring the flows doily 16 A. Yes, it is. <br /> 17 for about two months until it subsided. 17 Q. And does that contain as attachments the <br /> 18 Q. Okay. Haw did Snowcap decide to address 18 Flugro report and the Huddleston-Berry -- no — the <br /> 19 the hydrologic com amication that Mr. Boulay and 19 Flugro report previously discussed? <br /> 20 yourself observed and that was documented in his 2014 20 A. Yes. <br /> 21 report? 21 MR. JUSTUS: Okay. I'd like to submit <br /> 22 A. Well, we -- we agreed to repair and fix 22 Exhibit A-30. <br /> 23 the hydrologic communication through MR-82. 23 MR. BECWITH: No objection. <br /> 24 MR. JUSTUS: Okay. I previously visited 24 MR. STUTZ: None. <br /> 25 with Mr. Beckwith about the submittal of MR-82 into 25 MR. ROBERTS: It's admitted. <br /> 190 192 <br /> 1 evidence. It is the minor revision to the permit. It 1 MR. JUSTUS: Thank you. <br /> 2 is, we believe, part of the record, but Snowcap could 2 Q. (BY MR. JUSTUS) All right. When did <br /> 3 like to have it submitted into evidence. 3 you subsequently submit the repair plan required by <br /> 4 Let me find a -- I think it's Exhibit 4 MR-82? <br /> 5 A-27. We'll give the objectors an opportunity to 5 A. The repair plan? <br /> 6 review that, but we would like to have that submitted 6 Q. Yes. <br /> 7 into evidence as the revision to the permit to address 7 A. Sanetime in August of 2016 or '15. <br /> 8 the hydrologic cammmication. 8 Q. Why don't I direct you to Exhibit 34, if <br /> 9 MR. BEC WWITH: Is this a one-page or 9 that will help you refresh your recollection. <br /> to multiple page doazrent? 10 A. September 27, 2016. <br /> 11 MR. STOVER: It is a single page. 11 Q. All right. And dial that include a <br /> 12 MR. JUSTUS: It is -- it is a two-page 12 repair plan? <br /> 13 docu ent. It has the approval sheet, and it has the 13 A. Yes, it did. <br /> 14 subsequent attadment, which would be the inclusion in 14 Q. Okay. And that was based upon what <br /> 15 the permit. 15 information? How did you develop that repair plan? <br /> 16 MR. BECIiWITH: The text? 16 A. It was based on the two ERT studies that <br /> 17 MR. JUSTUS: Yes. 17 Flugro did as well as -- as well as SO's reports. <br /> 18 MR. BFCIWTH: We have no objection. It 18 MR. JUSTUS: All right. I'd seek to <br /> 19 is already in part of the record, but we have no 19 achnit Ddiibit A-34. <br /> 20 objection to it being an exhibit. 20 MR. BECKWITH: No objection. <br /> 21 MR. STUTZ: None here. No objection. 21 MR. STUTZ: No objection. <br /> 22 MR. ROBERTS: A-27 is admitted. 22 MR. ROBERTS: It's admitted. <br /> 23 Q. (BY MR. JUSTUS) Wbat steps did Snowcap 23 Q. (BY MR. JUSTUS) Did you receive any <br /> 24 take through your office to amply with MR-82, which 24 notice or did Snowcap Coal receive any notice that it <br /> 25 was Exhibit A-27? 25 had submitted a couplete application? <br /> 191 193 <br />