My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-26_REVISION - C1981010 (13)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2022-10-26_REVISION - C1981010 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2022 2:08:32 PM
Creation date
10/31/2022 2:03:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
10/26/2022
Doc Name Note
Cover Letter
Doc Name
Adequacy Review Response
From
Trapper Mining, Inc.
To
DRMS
Type & Sequence
RN8
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Robin Reilly, CDMG <br /> Re: RN-08 Permit Renewal <br /> Page 14 <br /> Table 1 <br /> Bond cost estimates based on PR-9 quantities with current CIRCES cost. <br /> Table A-2.2 Drill and Blast Equipment Costs <br /> Ownership Oper. Cost <br /> Equip Cost/Hour Cost/Hour Attachments Operator Total <br /> Drilling Equip. 96.39 131.63 0 0 228.02 <br /> Cat D10T Dozer 153.67 166.94 0 41.55 362.16 <br /> Drill & <br /> Table A-5.1 Blast (Highwall Reduction) <br /> Drill High- Bench- <br /> BCY Drill Hours wall ing Blasting $ <br /> Pit Blasted 3 Footage 1 Drill $ Length Hrs 2 Bench $ 4 Total $ <br /> L Pit 1,641,215 49,236 273.54 $62,371.64 5000 80 28,972.80 $492,364.50 $583,708.94 <br /> (1) based on 30'x 30' burden and spacing and 180 feet per drill hour <br /> (2) 16 hrs per 1000' of highwall <br /> (3) from L & N Pit Grading Volumes (de-swelled by 25%) <br /> (4) $0.30/cyd from <br /> Trapper Budget $ 0.30 <br /> Table A-13.3 Bore Hole Sealing Work - Seal Monitoring Wells <br /> Borehole Sealing/Item Unit Total <br /> Description Method Diameter Length Quantity Unit Cost Costs <br /> Portland cement <br /> grout-4 in. <br /> (labor, equip, <br /> CY-A materials) 4.5 35 35 LF 5.55 194.25 <br /> Portland cement <br /> grout-4 in. <br /> (labor, equip, <br /> CY-1 materials) 4.5 165 165 LF 5.55 915.75 <br /> Portland cement <br /> grout-4 in. <br /> (labor, equip, <br /> CY-2 materials) 4.5 285 285 LF 5.55 1581.75 <br /> Portland cement <br /> grout-4 in. <br /> (labor, equip, <br /> CY-3 materials) 4.5 430 430 LF 5.55 2386.5 <br /> PVC plug-4 in. <br /> Plug for 4"-6" Diameter <br /> Diam. Holes borehole 4 NA 4 EA 33.98 135.92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.