Laserfiche WebLink
i <br />00 <br />El <br />COM/NGLED PROCESS <br />AND STORMWATER <br />DISCHARGE PO/NT <br />OVERBURDEN <br />STOCKPILE <br />❑O F7 <br />3Of00 <br />0 <br />=I <br />NORTH <br />O0 150 300 <br />( IN FEET) <br />�z <br />Know what's below. <br />Call before you dig. <br />TYPICAL MINE SECTION <br />G 11 INCH GAS LINE <br />G 2 INCH GAS LINE <br />G 3 INCH GAS LINE <br />G 4 INCH GAS LINE <br />G 6 INCH GAS LINE <br />G 8 INCH GAS LINE <br />0134- 4 2022 <br />pWWON toF REQ NATION, <br />MININGAFTRPIERQI.S <br />PREPARED UNDER THE SUPERVISION OF: <br />"Y''/---�/��2 <br />NAME Kyle S. Regan P.G. DATE <br />QUALIFIED AS A PROFESSIONAL GEOLOGIST AS <br />DEFINED BY COLORADO STATUTE. <br />CIVIL RESOURCES <br />323 5th STREET <br />P.O. Box 680 <br />FREDERICK, CO 80530 <br />303.833.1416 <br />WWW . CIVILRESOU RCES. COM <br />RED TIERRA EQUITIES, LLC <br />8301 E PRENTICE AVE #120 <br />GREENWOOD VILLAGE, CO 80111 <br />303.771.1005 (p) <br />CONTACT: DREW DAMIANO <br />REVISIONS I <br />NOJ DESCRIPTION DATE <br />DESIGNED BY: BLH DATE: 9/16/2021 <br />DRAWN BY: KR SCALEAS NOTED <br />CHECKED BY: BLH AS NOTED <br />)OB NO.: 303.001.04 <br />DWG NAMEtGILCREST-AREA-GEOLOGY. DW( <br />MINE PLAN <br />STOCK PILE <br />LOCATIONS <br />EXHIBIT C-6 <br />F- <br />H <br />G/ <br />L.L <br />O <br />1..� <br />� <br />z <br />0 <br />oN <br />0 <br />z <br />J <br />0 <br />0 <br />U <br />U <br />U <br />w <br />w <br />w <br />N <br />U <br />,—I <br />J <br />Vl <br />I..L <br />0 <br />REVISIONS I <br />NOJ DESCRIPTION DATE <br />DESIGNED BY: BLH DATE: 9/16/2021 <br />DRAWN BY: KR SCALEAS NOTED <br />CHECKED BY: BLH AS NOTED <br />)OB NO.: 303.001.04 <br />DWG NAMEtGILCREST-AREA-GEOLOGY. DW( <br />MINE PLAN <br />STOCK PILE <br />LOCATIONS <br />EXHIBIT C-6 <br />