Laserfiche WebLink
og' <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> 187 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> TR-2 <br /> REQUEST FOR TECHNICAL REVISION(TR)COVER SHEET TlyL/j0?A <br /> File No.: M- 1 998-058 Site Name:Tellier Pit <br /> County ROUtt TR# (DRMS Use only) <br /> Permittee:Oldcastle SW Group Inc. dba United CornVyf"� 'es <br /> REC� <br /> Operator(If Other than Permittee): <br /> Permittee Representative:.Jason Burkey <br /> DIVISION OF RECLAMATION, <br /> Please provide a brief description of the proposed revision: MINING 8SAFETV-MINERALS <br /> Revision to the final reclamation seed mix&added internal access roads and small catchment area to the final <br /> reclamation plan per owner request. <br /> As defined by the Minerals Rules,a Technical Revision(TR) is:"a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are,still outstandinp deficiencies_ the Division must denv the.TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the vaihmittal of a TR:however, it is im to the nermittee,to nrovide- <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> re,t,lamatinn nlgn mane that aernrately deni&the,rhanae,c nronnged in the re,m2e,eted TR <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 IOc, 111, 112 construction <br /> materials, anti 112 quarries $216 <br /> 112 hard rock_(not DMO) $175 <br /> l l Od. l l 2d(1, 2 or 3) $1006 <br />