My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-30_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2022-09-30_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2022 11:38:02 AM
Creation date
10/28/2022 11:28:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
9/30/2022
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company
Inspection Date
9/28/2022
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 28,2022 C-1981-019/Colowyo Coal Mine ZTT <br /> Reclamation parcel ST001 was inspected. ST001 is located just east of the South Taylor Pit and was reclaimed in <br /> 2011.This area recently received cross ripping for additional erosion control for this area.No signs of erosion was <br /> observed and the ST001 remains stable.No issues were observed. <br /> ST001 parcel. <br /> SIGNS AND MARKERS —Rule 4.02: <br /> Mine identification signs were observed along the permit boundary. All information for compliance were <br /> observed. <br /> Topsoil pile markers were observed at each topsoil pile inspected. <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> Topsoil was actively being spread at the West Pit reclamation. <br /> Topsoil Pile 26 A was inspected. 26A is located north of the Collom Spoil Pile.Topsoil stripping activities from <br /> the Collom Gulch has added to the pile in the previous months. The currently approved topsoil stipping activities <br /> have concluded and the pile is no longer receiving additional topsoil.At the time of the inspection,the additional <br /> topsoil to Pile 26A and is being planned to be shaped and seeded. <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.