My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-29_PERMIT FILE - M2022037 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022037
>
2022-09-29_PERMIT FILE - M2022037 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2022 8:59:16 AM
Creation date
10/28/2022 8:54:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022037
IBM Index Class Name
Permit File
Doc Date
9/29/2022
Doc Name
Incompleteness Response
From
Ty Stogsdill
To
DRMS
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br /> Saffer Pit <br /> MINING PLAN <br /> A tracked dozer or front-end loader working from east to west will push the sand <br /> and gravel being mined in this operation into stockpiles. A front-end loader will then load <br /> the material from the stockpile into haul trucks. Some of the sand and gravel could <br /> remain in the stockpile for several weeks. The sand and gravel will be utilized in the <br /> maintenance and construction of county roads in District 2 of Lincoln County. Mining is <br /> already in operation in the existing area and will continue intermittently until the year <br /> 2028 or 2030 depending on the amount of material in the pit. <br /> Prior to removal of the sand and gravel in the new area, 3 to 6 inches of topsoil <br /> will be stockpiled for later use in the reclamation of the affected lands. These topsoil <br /> stockpiles will be hand seeded if necessary to stabilize the piles and prevent erosion. The <br /> I to 2 feet of overburden that underlies the topsoil will either be used as binder or <br /> stockpiled for later use in the reclamation_ These stockpiles will also be hand seeded as <br /> required for stabilization and to prevent erosion. The maximum size area that will be <br /> mined at one time would be from 5 to 6 acres; some reclamation will take place <br /> concurrently with the mining operations in order to keep the affected area at the 5 to 6 <br /> acre size. Judging from the amount of material available this pit should be in operation <br /> for about 10 to 15 years. The pit will be active but will be used fewer than 180 days per <br /> year.No water will be used to produce the sand and gravel being mined nor will any <br /> chemicals or explosives be used in this operation. <br /> The ranch road will be smoothed by the county using a motor grader. It will not <br /> be elevated but will be bladed to approximately twenty(20)feet wide to provide easier <br /> access to the site. A haul road into the pit will be also put in by the county road and <br /> bridge forces. The haul road enters the pit from the north side of the boundary. This haul <br /> road will also be approximately twenty (20) feet wide. Since these roads are not <br /> considered to be permanent typical Lincoln County specifications will not be used. <br /> Lincoln County utilizes somewhat modified Colorado Department of Transportation <br /> Specifications when constructing permanent county roads. <br /> The floor or bottom of the pit will slope gradually one to five (1 to 5)percent up <br /> to the east until it is necessary to put in the final finished slopes that would go up to the <br /> pit boundaries. The final slopes will be 4:1 or flatter. <br /> The over burden to be removed is a mix of soil and sand and gravel that gets <br /> sandier with increasing depth. The sand and gravel to be mined varies in thickness from 7 <br /> to 12 feet. The material that under lays the sand and gravel is a mix of clay and sand that <br /> turns to clay at greater depth- <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.