My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-26_HYDROLOGY - M2008082
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008082
>
2022-10-26_HYDROLOGY - M2008082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2022 8:53:57 AM
Creation date
10/27/2022 9:19:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Hydrology
Doc Date
10/26/2022
Doc Name
Substitute Water Supply Plan
From
Water Resources
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ready Mix Concrete Substitute Water Supply Plan Page 5 of 9 <br /> October 26, 2022 <br /> • Distance from centroid of the Stage 5 mining area to Big Dry Creek = 318 feet <br /> • Distance from centroid of the Stage 6A mining area to the Big Dry Creek = 1,356 feet <br /> • Distance from centroid of the Stage 6B mining area to the Big Dry Creek = 1,724 feet <br /> • Distance from centroid of the Stage 6C/6D mining area to South Platte River = 643 feet <br /> • Distance from centroid of the Stage 7A mining area to Big Dry Creek = 665 feet <br /> • Distance from alluvial boundary (based upon CDSS South Platte River alluvial aquifer <br /> boundary mapping <br /> o 7,250 feet for Stage 1 and 2 <br /> o 7,830 feet for Stage 3B <br /> 0 1,395 feet for Stage 5 <br /> o 8,557 feet for Stage 6A <br /> o 8,680 feet for Stage 6B <br /> o 9,164 feet for Stage 6C/6D <br /> o 6,978 feet for Stage 7A <br /> Normalized lagged factors were developed to determine the timing of lagged depletions to the <br /> stream as summarized in the table below: <br /> Depletion Laggiug Factors <br /> Stage 6a Stage 6E Stage 3S Stage 6C'6D Stage 7? <br /> Stage 1 Depletion Stage 2 Depletion Depletion Depletion Depletion Depletion bepletian <br /> Lagging Factors LaggingFactots <br /> La gin Factors Laggiug Factors Lagging Factors Lagging Factors Lagginz Factors <br /> Lagging Laggitxg Lagging Lagging Lagging Lagging Lagging <br /> Month Factor Month Factor Manth Factor Month Factor Factor Month Factor Month Factor <br /> 1 0.9580 1 0.4693 1 0.400 7 1 0.2988 1 0.6541 l 0.68 L 7 1 0.8274 <br /> 2 0.1040 2 02647 2 0 2808 2 0.2921 2 0.2023 2 0.19 L2 2 00610 <br /> 3 0.0196 3 0.0712 3 0 0815 3 0.0982 3 0.0449 3 00414 3 00319 <br /> 4 0.0108 4 0.0401 4 00441 4 0.0542 4 0.0742 4 00217 4 00203 <br /> s 0.0077 5 00292 5 00299 5 0.0360 5 0.0169 5 0.0142 5 00165 <br /> 6 0.0238 6 0.0232 6 0.0287 6 0.0134 6 0.0106 6 0.0132 <br /> 7 00202 7 0.0194 7 0.0240 7 0.0114 7 0.0087 7 0.0117 <br /> 8 0.0174 8 0.0170 8 0-0210 8 0.0099 8 0.D075 8 0.0010 <br /> 9 0.0150 9 0.0151 9 0-0187 9 0.0086 9 0.0066 9 0.0082 <br /> 10 0.0130 10 0.0135 10 0-0168 10 0-0077 LO 0.0060 <br /> 11 0.0113 11 0.0121 31 0-0151 11 0.0067 L1 0.0055 <br /> 12 0.0097 12 00169 12 0.0137 L2 0.0049 <br /> 13 0.0085 13 00099 13 0.0124 <br /> 14 0.0073 14 00029 34 0.0112 <br /> 15 0.0080 15 0-0101 <br /> 16 0.0072 26 0.0092 <br /> 17 00061 17 0.0083 <br /> i <br /> 18 0.0059 18 0-0075 <br /> 19 0.0053 19 0-0068 <br /> 20 0-0061 <br /> 21 0.0056 <br /> 22 0.0050 <br /> For4L 1.0000 TOTAL 10000 TOTAL 10000 TOTAL 1.0000 Toi.-LL 10000 TOTAL 1,0000 TOTAL L0000 <br /> The total projected lagged depletions from mining operations are shown in Table 2, Column 8, and <br /> total 109.79 acre-feet for this plan period. For purposes of this SWSP depletions are assumed to <br /> accrue to a point on the South Platte River located 1,885 feet from the West Section line and <br /> 1,600 feet from the South Section line in Section 6, Township 1 North, Range 66 West, 61h P.M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.