Laserfiche WebLink
i. (Summary) - daily <br /> A G D E F G H I J K L 1`,1 N <br /> 1 Example Aug Plan <br /> 2 Summary <br /> 3 Water Year <br /> 4 2021 <br /> 5 <br /> 6 <br /> Depletions&Obligations Replacamanta <br /> 7 <br /> Call is Plan In <br /> Priority? lagged OOP tagged pond Total <br /> 8 RFOs Total Aug Station Balance Net Effect <br /> GATE Depletions Depletions Release Credits <br /> 9 0102345 0103456 <br /> 10 (admin no,) (y/n) WO (cfs) (cfs) (cfs) (cfs) (ofs) WS) WO (cf:) <br /> 11 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (it) <br /> 26 11/15/2020 2169&C0000 n 0.03 0.03 D.03 0.06 O.Oa 0.05 0.05 -0.01 <br /> 27 11/16/2020 21698,00000 n 0.03 0.03 0.03 0.06 0.00 0.06 0.06 0.00 0.00 <br /> 28 11/17/7020 21698.00OK n 0.03 0.03 0.03 0.06 0.00 0.06 0.06 0-00 040 <br /> 29 11/18/2020 21698.00000 n 0.03 0.03 0.03 0.06 0.00 0.06 0.06 0100 0.00 <br /> 30 IV19/2020 99999.00000 y 0.03 0.00 0.09 0.03 0.00 0.06 0.00 0.06 <br /> 31 11/20/2020 99999.D0000 y 0.03 0.00 0.03 0.03 0.00 .06 0.00 0.06 <br /> 32 11/21/2020 99999,i10000 y 0.03 0.00 0.03 0.03 0.05 -0.01 0.05 <br /> 33 11/22/2020 21698A0004 n 0.03 0.03 CT 0. 5 0.05 -0.01 <br /> � GeMrn9iMn Wal maObii dnm noM ��• �� <br /> The Balance column is the balance of Replacements and <br /> actual Depletions/Obligations regardless of whether the <br /> plan is in or out of priority. It is calculated by subtracting <br /> Depletions and Obligations from Replacements. <br /> j. (Summary) - a monthly summary table may be added at the bottom of the Summary tab below <br /> the daily summary <br /> i <br /> 380 Monthly Summary <br /> Number of days %of Days lagged 0OPla9ged RFOs Total Aug Station Res Release Total Balance Net Elver <br /> 381 Month Nan is In Priority rn Priortty Depletions Depletions <br /> 382 of days) (%) (ac-h) (ac-ftl Sec-ftl (ac-fU (ac-ft) lac-ft) (at-it) Jac-ft) (ac-R) <br /> 383 i) (2 3 4 5 6 7 8 9 30 11 <br /> 3B4 Nar20 O.00 D% 1.77 1 77 181 3.59 0.00 424 426 0.68 0.58 <br /> 385 Dec-20 0.00 D% 1-32 1.32 1.41 2.73 0.DO 4.32 4.32 1.59 1.59 <br /> 386 Ian-21 30.00 97% 1.25 0.04 1.15 1.19 0.00 0.77 0.77 -1.63 0.69 <br /> 387 teh-2_ 2800 100% 1.17 COO 0.89 0.89 COO coo 0 00 -2.06 0.0a <br /> 388 mtar-21 31.00 t00% 3.17 0.00 0.88 0.88 0.00 000 0-00 -2.05 0-DD <br /> 389 Apr-21 9,00 30% US 0.C4 0.84 0.88 3.83 0.00 3.83 1.75 2.38 <br /> 390 May-2'- 0.00 0% 0.00 O.DO 0.00 0.00 0.00 0.00 0.DO 0.00 O.DG <br /> 391 Jun-21 0.00 0% 0.00 000 a.00 Om 000 0.00 000 a. 0.00 <br /> 392 Iv!-2 000 0% 000 0 DD a 00 Om 0 00 coo 0 00 0-PC <br /> 393 Aug-2: 0.00 D% 0.00 000 0.00 0.00 0.00 000 0 DO 0.00 <br /> 394 Sep-2' 0.00 0% 0.00 ODD C.00 0.00 0.00 0.00 O.DC <br /> 395 Oct-2 0.00 D% 000 0 M 0.00 000 00 D Co 0.DC <br /> 396 <br /> CcWack&Plan Info Depletions&Obligati a PDnd Summary DWR Version [�+ <br /> Net Effect is the Balance or Net Impact value with the <br /> priority of the plan included. Plans considered in priority <br /> may not be required to replace depletions. This column <br /> represents whether the Aug plan shows injury to the river <br /> or has sufficiently replaced its uses. <br /> Questions can be submitted to Ask DWR by visiting the DWR homepage at: Page 15/15 <br />