My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-26_HYDROLOGY - M2008082
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008082
>
2022-10-26_HYDROLOGY - M2008082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2022 8:53:57 AM
Creation date
10/27/2022 9:19:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Hydrology
Doc Date
10/26/2022
Doc Name
Substitute Water Supply Plan
From
Water Resources
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br /> dDivision of Water Resources <br /> Department of Natural Resources <br /> October 26, 2022 <br /> Jennifer S. Lindahl, P.E. <br /> Bishop-Brogden Associates, Inc. <br /> 333 West Hampden Avenue, Suite 1050 <br /> Englewood, Colorado 80110 <br /> Re: Morton Lakes Pit Substitute Water Supply Plan (WDID 0202616) <br /> Morton-Holton Lakes Mine DRMS File No. M-2008-082 (WDID 0203053) <br /> Sections 1 and 12, T1N, R67W of the 6th P.M. <br /> Sections 6 and 7, TIN, R66W of the 6th P.M. <br /> Water Division 1, Water District 2, Weld County <br /> SWSP ID: 5178 <br /> Approval Period: January 1, 2022 through December 31, 2022 <br /> Contact phone number for Ms. Lindahl: (303) 806-8952 <br /> Contact email address for Ms. Lindahl: jlindahl@bbawater.com <br /> Dear Jennifer S. Lindahl, P.E.: <br /> We have reviewed your letter dated November 5, 2021 requesting renewal of the substitute water <br /> supply plan ("SWSP") to cover depletions at the Morton Lakes Mine ("Morton Lakes") and Holton <br /> Lake Mine ("Holton Lakes"), operated by Brannan Sand and Gravel Company LLC ("Brannan" or <br /> Applicant"). On March 6, 2017 the Colorado Division Mining and Safety ("DRMS") approved the <br /> incorporation of the Holton Lakes Mine into the Morton Lakes Mine, therefore both mining permits <br /> are now operating under Morton Lakes Mine (M-2008-082). <br /> The previous SWSP for the Morton-Holton Lakes was approved on November 24, 2020 to cover <br /> operations for October 1, 2020 through December 31, 2021. The required fee of $257 for this SWSP <br /> has been submitted (receipt no. 10016738). <br /> SWSP Operations <br /> The Morton-Holton Lakes Mine is located in the SE '/a of Section 1 and the NE '/a of Section 12, all in <br /> Township 1 North, Range 67 West of the 6th P.M., and the SW '/a of Section 6, and the NW '/a of <br /> Section 7, all in Township 1 North, Range 66 West of the 6th P.M. The depletions that result from <br /> the mining operation over the period of this SWSP include evaporation from exposed groundwater, <br /> dust suppression, dewatering, water used to wash mined product, water removed in mined product, <br /> and water pumped for construction of a slurry wall at Stage 7A and Stage 7B. <br /> Mining of the Morton Lakes site is presently expected/projected to last until at least 2026. The <br /> current mining plan for the site is shown in attached Figure 1. The replacement of depletions for <br /> Morton-Holton site is fully consumable water leased from the City of Aurora. <br /> The mining status of the Stages is described below: <br /> • Stage 1 Mining at Stage 1 was completed in July 2016. <br /> 1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 www.colorado.gov/water <br /> Jared S. Polis, Governor Dan Gibbs, Executive Director Kevin G. Rein, State Engineer/Director I C O <br />
The URL can be used to link to this page
Your browser does not support the video tag.