Laserfiche WebLink
r <br /> • Page I of 3 <br /> Groundwater Monitoring.Field Form <br /> Station/well' ' <br /> ' ► A • Date: Observer: <br /> Location:�..,�;r � i...i n � Start Time: t. <br /> Sampling i awnef �•}. <br /> Site: End Time: <br /> Team: <br /> Description: <br /> Lead Signature.•`—� <br /> Project: � •� p <br /> 01 <br /> t Date: /____��l—t` �1�,_ <br /> Sampling Instruments: p lG. <br /> Well Purging FWeUDe th d !fig Information <br /> P ( t): ft Static depth to water(d.): ft Sam <br /> radius(r„): in/ft Bore volume a d ple/Set Depth: ft volume a rl d — .4g : ( �")'--�/gal Casing radius r� <br /> / al Total volume; ( ):------_.__in/ft <br /> fts/ al Total a 3• ftal at <br /> PH SpGCond Water . <br /> Purge Time �;� (s.u) (mS/cm, DO ORP Turb. Clarity Volume Cumulative <br /> µS/cm) (mid,%) (rmV) (IYTU) (poor/ Purged Volume purged <br /> mod/ (Gallons) (Gallons) <br /> ,men <br /> I <br /> I <br /> Field Measurements at Time of Sam in <br /> Parame Measurement <br /> ter lteadin Time (In sitn/Container) <br /> Air Tem °C Instrument Comments <br /> Water Tem °C Thermometer <br /> $ a.u. HCoalO YSI <br /> SpC/Conductivity HConlo/YSI <br /> (MVICRy p8/cM) ��3•ORP rm HCon10/YSI <br /> - <br /> DO m 0/• H310/YSI <br /> Turbidi D0310/YSI <br /> Discharge ]VIicroTPI <br /> ft3/s,L/s m Flow meter/ <br /> bucket/estimate <br /> Number and of filters used; <br /> GpS Coordinates; <br />