Laserfiche WebLink
Treatment Plant Sample weekly during Ongoing; sampling conducted as <br /> Discharge discharge required during discharge events. <br /> Treatment and discharge has been <br /> suspended as of December 9, 2009 until <br /> further notice. <br /> Whirlwind Decline Sample for 2 quarters and Completed <br /> (Sump) measure flow for 4 quarters <br /> Packrat Mine Sample for 2 quarters when Not Started; the Packrat Mine is not yet <br /> Water accessible accessible. <br /> DP Spring Measure flow quarterly Ongoing <br /> PR Spring Sample and measure flow Completed <br /> quarterly for 5 quarters <br /> Measure flow quarterly and Ongoing <br /> sample annually thereafter <br /> Monitoring Well 8 samples over 15 months Completed <br /> W-1 Measure quarterly and Ongoing <br /> sample annually thereafter <br /> Lumsden Canyon As needed in support of Completed;Two samples collected from <br /> Hydrogeological Report to 3 points in Lumsden Canyon. No further <br /> be prepared by Western sampling events are scheduled at this <br /> Water& Land time. <br /> Seep Surveys Annually Ongoing <br /> Rajah 49 Mine, Sample as discharge is Ongoing <br /> Thornton Portal observed in annual seep <br /> (Rajah Spring) surveys <br /> Waste Rock Collect grab sample 1 annual composite sample collected to <br /> quarterly and composite date. Sampling continues quarterly. <br /> annually for analysis <br /> Sediment Pond Sample quarterly if Ongoing Monitoring; no samples <br /> Sampling discharging collected to date. <br /> Dolores River Sample during treatment Suspended; not required until water <br /> Sampling discharge if flowing into treatment plant resumes operation. No <br /> Dolores River samples collected to date. <br />