My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-20_HYDROLOGY - M2007044 (3)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2007044
>
2022-10-20_HYDROLOGY - M2007044 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2022 8:44:38 PM
Creation date
10/20/2022 3:12:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Hydrology
Doc Date
10/20/2022
Doc Name Note
Cover Letter, TOC, and Summary
Doc Name
Hydrology Report
From
Energy Fuels Resources USA Inc
To
DRMS
Annual Report Year
2022
Report Quarter_Month
3
Email Name
THM
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PR Spring <br /> The field parameters were measured at PR Spring on August 1, 2022. The flow is measured by <br /> timing the fill rate of a five-gallon bucket. Field parameters from PR Spring are measured in the <br /> stock tank located at the spring. The field sampling form is provided in Appendix 3. <br /> Flow rates and field parameters at PR Spring are summarized in Appendix 1, Attachment 5. The <br /> historical analytical data from PR Spring are summarized in Appendix 2, Table 2. <br /> Monitoring Well W-1 <br /> Monitoring Well W-1 was installed on October 12, 2008 for the purpose of characterizing and <br /> monitoring groundwater quality downgradient of the waste rock storage area. <br /> Monitoring Well W-1 was measured for the static groundwater level and field parameters on <br /> August 1, 2022. The water level at Monitoring Well W-1 is consistent with previous <br /> measurements. The field sampling form is provided in Appendix 3. <br /> Water levels and field parameters are summarized in Appendix 1, Attachment 6. The historical <br /> analytical data from Monitoring Well W-1 are summarized in Appendix 2, Table 3. <br /> Lumsden Canyon Seep <br /> The Lumsden Canyon Seep (also referred to in earlier reports as Lumsden Canyon Spring) was <br /> monitored for field parameters and sampled in June and December of 2008. This location was <br /> monitored by Western Water & Land, Inc. during hydrologic reconnaissance required by BLM <br /> stipulations to the Plan of Operations.No further sampling or field parameter measurement events <br /> are scheduled at this time. <br /> Historical field parameters are summarized in Appendix 1, Attachment 7 and the historical <br /> analytical data from the Lumsden Canyon Seep samples are summarized in Appendix 2, Table 4. <br /> Rajah 49 Thornton Portal(Rajah Spring) <br /> The Rajah Spring has been sampled annually from 2009 to 2022. Field parameters and a sample <br /> were collected on August 1, 2022, during the 2022 Seeps and Springs Survey. The Annual Seeps <br /> and Springs Survey notes and photo log are included in the Third Quarter Report. The analytical <br /> laboratory data are provided in the Third Quarter Report. EFRI will continue to include the Rajah <br /> Spring in future annual seeps and springs surveys. <br /> Waste Rock <br /> No ore was mined in the third quarter 2022. The Mine is currently in operation with rehabilitation, <br /> maintenance and monitoring activities being conducted.EFRI will resume the quarterly waste rock <br /> sample collection next quarter. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.