Laserfiche WebLink
Rule 2.05.6(4) Mitigation of Impacts, Public Parks and Historic Places <br /> 2. Please address the concerns related to the 17 October 2022 letter from History Colorado <br /> as it relates to listed archeological sites and provide information as to Trapper Mine <br /> Inc's,plan to protect any sites listed or eligible for listing as determined by SHPO. <br /> Rule 3.02.2 Performance Bond <br /> DRMS understands that no additional disturbance was requested for TR130 in the original <br /> application. DRMS also notes that in PR10 206.7 acres were approved for disturbance and that <br /> pre TR132 Trapper has utilized 171.1 acres of the 206.7 requested. Proposing TR132 would <br /> utilize 204.92 acres of the PR10 request, leaving 1.78 acres of the PR10 request. <br /> Also, reclaimed and not yet bond released for TR130 totaled 90.4 acres. DRMS will carry this <br /> acreage over to the TR132 cost estimate. <br /> DRMS's CIRCES cost estimate indicated the amount required for reclamation associated with <br /> TR132 to be $238,830.00, not including the costs associated with acres reclaimed and not yet <br /> bond released (90.4 acres RNYBR). DRMS is addressing the costs for RNYBR and will provide <br /> those costs to Trapper Inc, as soon as possible. DRMS has sent on 11 October 2022, the Draft <br /> CIRCES calculation under separate cover. <br /> Sincerely <br /> Robin Reilley,M.S. GISP <br /> Environmental Protection Specialist 11 <br /> Robin.reilleykstate.co.us <br />