Laserfiche WebLink
Other Reclamation Permits held by Prospective Successor(if applicable): <br /> M2001016,M2016054,M1977141,M1992069,M2020058,M1999098,M1989029,M19N027,M2000087,M2004051,M1989120 <br /> M1992069,M2020058,M1999098M1989029,M1994027,M2000087,M2004051.M1989120 <br /> DESIGNATION OF REVIEW TIMELINE <br /> As explained above,the Permittee and Prospective Successor may waive their right to receive a <br /> decision on an Application within 30 days in order to allow the Division to calculate the required <br /> Financial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br /> one of the following two options to designate their choice. If Permittee and Prospective <br /> Suc c ree, Division will render its decision within 30 days. <br /> I have reviewed the information provided in this Application <br /> ,cessor <br /> ittee Packet,as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to WAIVE MY RIGHT TO A DECISION ON <br /> uccessor MY APPLICATION WITHIN 30 DAYS. <br /> I have reviewed the information provided in this Application <br /> Permittee Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br /> Prospective Successor ON MY APPLICATION WITHIN 30 DAYS. <br /> The Prospective Successor must provide an adequate Financial Warranty or conditional <br /> replacement Financial Warranty, consistent with the designation above. Hard Rock and <br /> Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br /> Each Financial Warranty must be submitted on the Board's approved forms(available online at <br /> hitp://minini,.state.co.us/Mineral%2OFonns.htm) <br /> - 6 - <br />