Table II 1 II N11ine1 1 I <br /> Underground Equipment Number <br /> Gardner Denver 10HP Slusher 1 <br /> Ingersoll Rand 20HP Slusher 6 <br /> Joy FF211 30 HP Slusher 2 <br /> Trident M#5211 Air Slusher and Buckets 10 <br /> Pumps/Machines <br /> Reed Shotcreet Machine 2 <br /> Grout Pump 1 <br /> ChemGrout Pressure Grout Pump 1 <br /> FMC Bean Pump 5 <br /> Climbers <br /> Alimak Raise Climber 3 <br /> Exhaust Fans <br /> JetAir 10HP 7 <br /> JetAir 30HP 1 <br /> JetAir 40HP 1 <br /> SMJ 20HP 1 <br /> Spendtrup 30HP 4 <br /> MPC <br /> 150 KVA Mine Power Center 1 <br /> 300 KVA Mose Power Center 1 <br /> 150 KVA Mrift Power Center 1 <br /> 500 KVA Mouth Power Center 1 <br /> 500 KVA Maise-1 Power Center 1 <br /> 300 KVA More Power Center 1 <br /> 3.3 Ventilation <br /> Three ventilation shafts are proposed for the mine. Two of the three (i.e.,the 960 Shaft and the <br /> Yellow Rose Shaft) ventilation shaft permit areas are 100' x 100' in size, or 0.23 acres and are in <br /> the conceptual stage of development(i.e.,not constructed). As such, details around construction <br /> and reclamation are not available. At this point, the 960 Raise has been removed from the mine <br /> plan and Ouray Silver will apply for an acreage reduction once Amendment 02 is approved. <br /> Should the Yellow Rose ventilation raise be proposed for construction, a Technical Revision will <br /> be submitted along with designs and updated reclamation plans and costs. <br /> The third raise bore/ventilation shaft,the Monongahela/Hubb Reed Raise,was completed in <br /> 2015 using a raise bore. This raise provides ventilation and serves as a secondary escapeway for <br /> the Revenue Mine. The features and their dimensions installed at the raise bore include the <br /> following: <br /> Revenue Mine <br /> Amendment 02 D-6 <br /> Updated August 2022 <br />