Laserfiche WebLink
16H-RI Production Well Drilling and Completion Information <br /> 0.0'-125.3' MD KB; 0.0'-112.6' MD GL: drilled 26.0" conductor hole <br /> 0.0'-125.3' MD KB; 0.0'-112.6' MD GL: intal led 16.0" ODx 15.124" ID conductor casing (J-55, 72.72 Ib/ft), cement to surface <br /> 125.3'-1154.0' MD KB; 112.6'-1141.3' NU GL: directionally drilled 13.5" diameter intermediate hole to kick-off point (KOP) <br /> 1154.0'-2235.0' MD KB; 1141.3-2222.3' MD GL: directionally drilled 13.5" diameter intermediate hole, 8.4*/100' build rate <br /> 0.0'-2232.4' MD KB; 0.0'-2219.7' MDGL: installed 9.625" OD x 8.921" ID intermediate casing (J-55, 36.0lb/ft), cemented to surface <br /> 1358.4'-1387.7' MD KB; 1345.7-1375.0' MD GL installed DV and ACP tools <br /> 2235.0'-2451.0' MD KB; 2222.3'-2438.3' MD GL: directionally drilled 7.875" production hole to 161-1-1 well pass-by <br /> Projected 1/11 Pass-By: 161-1-I: 2390.9' MD KB; 2378.2' MD GL; 16H-R: 2421.0' MD KB; 2408.3' MD GL <br /> 2020 Remedial Work (MD GL) <br /> 2006.0'-2010.0'* MD GL: mil led 8.562" OD hole <br /> 2010.0'*-2237.0' MDGL: drilled 6.125" OD hole <br /> 1939.7-2181.8' NM GL: installed 9.625" OD x 4.0" ID ASI-X packer/han erw/ 2.875" EUE tubin g & 6.125" op en bore 2" ID bit <br /> Plug and Abandon; September 2022 (MD GL) <br /> 100.0-1900.0' MD GL: perforate casing, 4 spf 90* phasing at 100.0, 230.0, 440.0, 1040.0, 1275.0, 1650.0, 1775.0, 1900.0 <br /> 1939.7-2181.8' MD GL: cement plug inside ASI-X acker/han er& 2.875" EUE tubing <br /> 0.0'-1939.7' MD GL: cement plug to surface, 15.0 bbls to annulus through perfs, approximately 9.9% excess <br /> perforations soo <br /> 4 spf, 900 phasing <br /> 100.0 MD GL -5800 <br /> 230.0 MD GL <br /> 440.0 MD GL 900 <br /> - 5700 <br /> 1000 <br /> -5600 <br /> 1100 <br /> Kick-Off Point 5500 <br /> 1154.0 MD KB <br /> 1141.3 MD GL <br /> 1200 <br /> 5400 <br /> A-Groove Aquifer 1300 <br /> DV and ACP Tools---im.- f <br /> 1358.4-1387.7 MD KB 5300 <br /> 1345.7-1375.0 MD GL <br /> Intermediate Hole r <br /> 13.5" dia., -8.40/100' Build Rate '1400 <br /> 125.3-2235.0 MD KB -5200 <br /> 112.6-2222.3 MD GL <br /> B-Groove Aquifer <br /> 7S -e , oo <br /> Intermediate Casing 5100 <br /> 9.625" OD x 8.921" ID; J-55, 36.0 Ib/ft, cement to surface <br /> 0�0.0-2232.4 MD KB 0.0-1939.7 MD GL <br /> 7.875" dia. Production Hole 0.0-2219.7 MD GL 'soo <br /> 2235.0-24�1.0 MD KB - <br /> 2222.3-2438.3 MD GL 2020 Remediation \ �- <br /> installed 9.625"A"ID ASI-X packer/hanger `MeaSUred 5000 <br /> w/2.875"EUE tubing&6.125"open bore 2"ID bit Depth GL <br /> Projected I/R Pass-by 1939.7-2181.8 MD GL <br /> 16H-I: 2390.9 MD KB; 2378.2 MD GL 2019 Remediation(per JD) 00 <br /> 16H-R: 2421.0 MD KB; 2408.3 MD GL milled through casing @ 2000 MD GL <br /> tagged hard @ 2020.0 MD G _ 4900 <br /> DS Aquifer <br /> perforations <br /> 0 4 spf, 900 phasing o <br /> East 1040.0 MD GL West 4800 <br /> 020 Remediation 1275.0 MD GL >_ <br /> a w Oo milled-2010.OD hole 1650.0 MD GL T-_ <br /> O 2006.0-2010.0'MDGL <br /> 0 0 ���- 1775.0 MD GL Lu j <br /> �2020Remedition/ o 1900.0 MD GL <br /> drilled 6.125"OD hole o Casing Deformation 1-4700 <br /> 2010.0*-2237.0 MD GL Casing Parting 2014.7 MD KB <br /> cement inside 2021.7 MD KB 2002.0 MD GL <br /> ASI-X packer/hanger 2009.0 MD GL <br /> & 2.875" EUE tubing - <br /> 1939.7-2181.8 MD GL 4600 <br /> Natural Soda LLC <br /> 16H-RI As-Built Well Completion Schematic - P&A <br /> Section 34, T1S, R98W Rio Blanco County, CO <br /> Daub&Associates,Inc. 1 1, +"� Date:October 3,2022 <br /> *2010.0 MD GL probable depth of bit exiting casing during 2020 remediation � � . .�i �, �. <br />