My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-05_PERMIT FILE - M2022037
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022037
>
2022-10-05_PERMIT FILE - M2022037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2022 8:17:01 AM
Creation date
10/5/2022 2:30:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022037
IBM Index Class Name
Permit File
Doc Date
10/5/2022
Doc Name
Incompleteness Response
From
DRMS
To
Ty Stogsdill - Lincoln County
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Incompleteness Notice, <br /> Saffer Pit M2022037 <br /> Page 3 of 4 <br /> b. the name and location of all creeks,on the area of affected land and within two hundred(200) <br /> feet of all boundaries of such area; <br /> c. Show the owner's name,type of structures, and location of all significant,valuable, and <br /> permanent man-made structures contained on the area of affected land and within two hundred <br /> (200)feet of the affected land. <br /> DRMS 5 Oct 2022 <br /> The above items were adequately addressed in Exhibit D: Reclamation Plan. <br /> EXHIBIT J—Proof of Mailing of Notices to Board of County Commissioners and Conservation District(Rule <br /> 6.3.10): <br /> DRMS 5 Oct 2022 <br /> The above item was adequately addressed in Exhibit J: Proof of Mailing. <br /> Primary Future(post-mining)Land Use. On page four,item 12,the rangeland box was checked. However, <br /> mailings to Commissioner's and Conservation District indicate agricultural as the post mining land use. Please <br /> check the box that best fits the post-mining land use. <br /> DRMS 5 Oct 2022 <br /> The above item was adequately addressed with the submittal of a new application page four. <br /> Please provide an Exhibit J pursuant that coincides with the application form and the public notices required under <br /> Rule 1.6.2(10)(d). Updating the application form as well as exhibit J may be required. <br /> DRMS 5 Oct 2022 <br /> The above item was adequately addressed with the submittal of a certificates of mailing dated 11 August <br /> 2022 to Conservation District and Board of County Commissioners. <br /> ADDENDUM 1—Notice Requirement(Rule 1.6.20)(d): <br /> Your application will not be considered filed until the information listed above is received and found sufficient to <br /> begin our review. A decision date will be established 30 days from the date of receipt and acceptance of all of the <br /> requested information. Additionally,if you have already published notice you will need to republish notice,but only <br /> after the Division considers the application complete and filed;the Division will notify you when you should initiate <br /> publication of your notice. This notice must be published in a newspaper of general circulation one time,within ten <br /> (10)days of the date your application is considered filed. This notice shall be supplied to all surface and mineral <br /> owners as well as owners of record within 200 feet of the boundary of affected lands. The final date for receiving <br /> comments is the twentieth(10t1i)day after the notice is published. <br /> Pursuant to Rule 1.4.1(8),you have sixty(60)days from the date of this letter to submit all necessary documents that <br /> the Division needs for an application to be considered filed. If,at the end of the sixty day period,the application has <br /> not been determined to be filed with the Division,the Division may deny the application and terminate the application <br /> file. Should additional time be required to submit all the necessary documents an extension request can be submitted <br /> in writing for the Division's consideration. <br /> The response to this Incompleteness Notice is due on or before 31 October 2022. <br /> The decision date will be 30 days after the Division finds the application filed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.