Laserfiche WebLink
No blasting will take place at the Delta Paving Gravel Pit. No refuse, acid, or toxic producing <br /> material are expected to be encountered in this operation. If these materials are encountered, at <br /> least two feet of inert material will be placed over the area and mining will move to a different <br /> area. <br /> 2. Mining Timetable <br /> Mining operations at the Delta Paving Gravel Pit are expected to take at least 16 years to <br /> complete, based on an annual average production of 100,000 tons. Actual production rates will <br /> fluctuate based on market conditions. An approximate mining timetable based on this <br /> production and the phased mining plan is shown in Table D-1. <br /> Table D-1 Mining Timetable <br /> Description . . <br /> equired <br /> Initial stripping of new mining area for Phase 1 1 month <br /> east portion of site <br /> Mine and reclaim Phase 1 according to 4 years <br /> approved plans.Reclamation occurs as mining <br /> has reached its maximum extents in an area. <br /> Initial stripping of new mining area for Phase 2 1 month <br /> southern portion of the site <br /> Mine and reclaim Phase 2 according to 4 years <br /> approved plans.Reclamation occurs as mining <br /> has reached its maximum extents in an area. <br /> Initial stripping of new mining area for Phase 3 1 month <br /> northwest portion of the site <br /> Mine and reclaim Phase 3 according to 4 years <br /> approved plans.Reclamation occurs as mining <br /> has reached its maximum extents in an area. <br /> Initial stripping of new mining area for Phase 4 1 month <br /> western portion of the site <br /> Mine and reclaim Phase 4 according to 4 years <br /> approved plans.Reclamation occurs as mining <br /> has reached its maximum extents in an area. <br /> Total 16 years <br /> 3. Mine Facilities and Operation <br /> The site will contain the following facilities and equipment: <br /> Facilities: <br /> - Portable hot mix asphalt (HMA) plant <br /> - Concrete batch plant <br /> - Portable wash plant <br /> - Portable crushing &screening unit <br /> Delta Paving Gravel Pit <br /> September 2022 D-2 Lewicki 81 Associates <br />