Laserfiche WebLink
EXHIBIT C -Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: 0 Zo ZZ and completion: O' Z o Z 7 <br /> 2) How many years is the mine anticipated to be operational: -5 <br /> - years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br /> (� all-yearlong or(_% seasonally, explain: q j&.g ;s o J Aj o eep,,tc: ,le #4-4 a V —pr+0 ber <br /> 4) How many aces of the mine site will be disturbed at any given time: acres <br /> 5) Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br /> =4-6 inches _ID_6-8 inches <br /> _F-I 8-10 inches _E3-10-12 inches <br /> Other: p- q i,7c, es. /No f we-aS Co'JAc,'Ili nu o 'CoPSoi �, <br /> N/A, explain: <br /> 6) Will you need to move any overburden (check one): (A)Yes or No <br /> a. If yes, approximately how thick is the overburden? /_/— S feet <br /> 7) How will the mine be accessed: (M existing roads (0) new roads will be created <br /> Please describe the existing road: / <br /> S Z o 1 r v.US L,j i�h i) .S,0o �rec� o f e /oca�`�a J ID c&A <br /> nsi: 2 track _J;11 be "'ueA :rc,ra Pco_ <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> 8) Will water be needed during the mining operation (check one): (_n)Yes or(, )No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed (check one): (fl)Yes or(X)No <br /> a. If yes,please describe the water diversions or impoundments: <br /> 10)Will any chemicals be used during the mining process (check one): (-a)Yes or Jgr)No <br /> a. If yes, please describe the chemical types and quantities to be utilized,chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />