429a, 429b, 435a,435b, 436a and 436b, some of which also include sites that are not addressed with SL- <br /> 15;these tasks will need to be reconciled when the next site-wide RCE is calculated. Tasks 435 and 436 <br /> include a number of MVBs that were never constructed. Only 7 holes and pads were drilled on the SS 1 <br /> panel, though 11 were permitted; one pad and hole has been left open. On the SS2 panel 12 holes were <br /> permitted but none were drilled;two pads were constructed, both of which have been reclaimed,together <br /> with all associated road. The pro-rated total of the estimated direct costs associated with these tasks (Y) <br /> is $201,891.31, as shown in table 4. <br /> Table 4 <br /> RN7 Cost Estimate Task Task Description Task Direct <br /> Number Cost <br /> 428a 4 of 12 E-seam MVBs, panel 7: plug and seal $16,859.00 <br /> Task 428a pro-rated for 3 of 4 MVBs $12,644.25 <br /> 428b 4 of 12 E-seam MVBs, panel 7: regrade $13,718.00 <br /> Task 428b pro-rated for 2.55 of 2.84 acres $12,317.22 <br /> 429a 2 of 8 E-seam MVBs, panel 8: plug and seal $8,428.00 <br /> Task 429a pro-rated for 1 of 2 MVBs $4,214.00 <br /> 429b 2 of 8 E-seam MVBs, panel 8: regrade $11,496.00 <br /> Task 429b pro-rated for 0.97 of 2.38 acres $4,685.34 <br /> 435a 11 SS1 MVBs: plug and seal $43,288.00 <br /> Task 435a pro-rated for 10 of 11 MVBs $39,352.73 <br /> 435b 11 SS1 MVBs: regrade $47,557.00 <br /> Task 435b pro-rated for 3.17 of 13.13 acres $11,481.77 <br /> 436a 12 SS2 MVBs: plug and seal $47,215.00 <br /> 436b 12 SS2 MVBs: regrade $69,981.00 <br /> Total applicable to SL-15 $201,891.31 <br /> In order to (i) comply with rule 3.03.1(2) and(ii) ensure that the revised required surety is <br /> sufficient to cover the remaining reclamation liability at the mine,the Division will release <br /> whichever is the smaller of the two values X and Y. In this case,the smaller value,X,is <br /> $143,551.21. <br /> The Division currently holds a performance bond of$15,000,000. Based on the observations above, the <br /> Division proposes to release $143,551.21. Following the approval of SL-15 the revised required surety <br /> will be $11,262,024.79,which is sufficient to assure completion of the remaining reclamation work at the <br /> site if the work had to be performed by the Division,including the cost of reestablishing vegetation on any <br /> revegetated areas, should those areas fail. The Division estimates its cost to complete remaining <br /> reclamation work at the site to be$11,174,877.69. <br /> C-1980-007 Page 9 of 10 <br />