My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-22_GENERAL DOCUMENTS - C2010089
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010089
>
2022-09-22_GENERAL DOCUMENTS - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 8:18:46 AM
Creation date
9/27/2022 8:16:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
General Documents
Doc Date
9/22/2022
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Chris Gilbreath Elk Ridge Mining and Reclamation, LLC
Type & Sequence
SL3
Permit Index Doc Type
Findings
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br /> Task description: Finish Grade Facilities Area <br /> Site: New Horizon North Mine Permit Action: S13-remaining Permit/Job#: C2010089 <br /> PROJECT IDENTIFICATION <br /> Task#: 031R State: Colorado Abbreviation: None <br /> Date: 9/16/2022 County: Montrose Filename: C089-031R <br /> User: JHB <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 14M Horsepower: 259 <br /> Ripper Attachment: Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $114.80 NA <br /> Operating Cost/Hour: $79.39 100 <br /> Ripper Ownership Cost/Hour: $0.00 NA <br /> Ripper Operating Cost/Hour: $0.00 <br /> Operator Cost/Hour: $28.56 NA <br /> Total Unit Cost/Hour: $222.75 <br /> Total Fleet Cost/Hour: $222.75 <br /> MATERIAL QUANTITIES <br /> Total Area to be graded or ripped: 8.30 acres <br /> Source of estimated acreage: Map 2.05.2-1 <br /> HOURLY PRODUCTION <br /> Average Grader Speed: 1.50 mph <br /> Selected Application: Finish grading(0-2.5 mph)- 1.5 <br /> Selected Blade Angle: 30 degrees <br /> Effective Blade Length: 12.10 feet <br /> Width of blade overlap per pass: 2.00 feet <br /> Net grading or ripping width per pass: 10.10 feet <br /> Unadjusted Hourly Unit Production: 1.8364 acres/hour <br /> Job Condition Correction Factors Site Altitude: 5000 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.90 (1sh/d,fay.) <br /> Net Correction: 0.9000 multiplier <br /> Adjusted Hourly Unit Production: 1.6527 acres/Hour <br /> Adjusted Hourly Fleet Production: 1.6527 acres/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 5.02 Hours <br /> Unit cost: $134.78 per acre Total job cost: $1,119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.