Laserfiche WebLink
Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.868 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4668 <br /> Adjusted unit 1,339.86 LCY/hr <br /> production: <br /> Adjusted fleet 2679.72 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.427/LCY <br /> Total job time: 8.13 Hours <br /> Total job cost: $9,292 <br />