Laserfiche WebLink
Page 10 of 33 <br /> Time: <br /> Truck Travel(Haul&Return)Time: Road Condition:Firm,smooth,rolling,dirt/lt. surfaced,watered, <br /> maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 3000.00 2.00 3.00 5.00 1550 2.142 <br /> Haul Time: 2.142 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> (min) <br /> 1 3000.00 -2.00 3.00 1.00 3503 1.049 <br /> Return Time: 1.049 minutes <br /> Total Truck Cycle Time: 6.866 minutes <br /> Loading Tool unit <br /> Production 1,629.09 LCY/Hour Adjusted for job efficiency: 1,352.15 LCY/Hour <br /> Truck Unit Production <br /> 587.24 LCY/Hour Adjusted for job efficiency: 487.41 LCY/Hour <br /> Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 3 Truck(s) <br /> Adjusted hourly truck team production: 1,462.23 LCY/Hour <br /> Adjusted single truck/loader team production: 1,352.15 LCY/Hour <br /> Adjusted multiple truck/loader team production: 1,352.15 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 17.34 Hours <br /> Unit cost: $1.700 /LCY Total job cost: $39,856 <br /> CIRCES Cost Estimating Software <br />