Laserfiche WebLink
Page 7 of 33 <br /> Truck Travel(Haul&Return)Time: Road Condition:Firm,smooth,rolling,dirt/lt. surfaced,watered, <br /> maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> (min) <br /> 1 1500.00 2.00 3.00 5.00 1550 1.175 <br /> Haul Time: 1.175 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1500.00 -2.00 3.00 1.00 3503 0.621 <br /> Return Time: 0.621 minutes <br /> Total Truck Cycle Time: 5.471 minutes <br /> Loading Tool unit <br /> Production 1,629.09 LCY/Hour Adjusted for job efficiency: 1,352.15 LCY/Hour <br /> Truck Unit Production <br /> 736.98 LCY/Hour Adjusted for job efficiency: 611.69 LCY/Hour <br /> Optimal No.of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 1,223.38 LCY/Hour <br /> Adjusted single truck/loader team production: 1,223.38 LCY/Hour <br /> Adjusted multiple truck/loader team production: 1,223.38 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 14.97 Hours <br /> Unit cost: $1.614 /LCY Total job cost: $29,548 <br /> CIRCES Cost Estimating Software <br />