My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-22_GENERAL DOCUMENTS - C2010089
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010089
>
2022-09-22_GENERAL DOCUMENTS - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 8:18:46 AM
Creation date
9/27/2022 8:16:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
General Documents
Doc Date
9/22/2022
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Chris Gilbreath Elk Ridge Mining and Reclamation, LLC
Type & Sequence
SL3
Permit Index Doc Type
Findings
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 33 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Replace Topsoil from Stockpile to 2013 Pit Area <br /> Site: New Horizon North Mine Permit Action: SL3 Permit/Job#: C2010089 <br /> PROJECT IDENTIFICATION <br /> Task#: 055 State: Colorado Abbreviation: None <br /> Date: 9/16/2022 County: Montrose Filename: 088-055 <br /> User: JHB <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Cat 777F <br /> -Loader: CAT 992K <br /> Support Equipment-Load Area: Cat DI IT- 11U <br /> -Dump Area: NA <br /> Road Maintenance-Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker, 10,000 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equip ment Maintenance E uipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 100 NA 35 35 <br /> Ownership cost/hour: $156.75 $202.43 $257.09 NA $114.80 $91.73 <br /> Operating cost/hour: $133.38 $182.41 $273.21 NA $27.79 $45.59 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. cost/hour: NA $0.00 $0.00 NA $0.00 $0.00 <br /> Ripper op. cost/hour: NA $0.00 $0.00 NA $0.00 $0.00 <br /> Operator cost/hour: $33.71 $40.71 $41.30 NA $28.56 $21.12 <br /> Unit Subtotals: $323.84 $425.55 $571.60 NA $171.14 $158.45 <br /> Number of Units: 2 1 1 0 1 1 <br /> Group Subtotals: Work: $1,073.23 Support: $571.60 Maine $329.59 <br /> Total work team cost/hour: $1,974.42 <br /> MATERIAL QUANTITIES <br /> Initial volume: 16,420 CCY Swell factor: 1.115 <br /> Loose volume: 18,308 LCY <br /> Source of estimated volume: Map 2.05.2-1,Division Volume Estimates <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload(weight)Basis: <br /> Material weight: 2,100 Pounds/LCY <br /> Description: Earth-Loam <br /> Rated Payload: 200,000 Pounds <br /> Payload Capacity: 95.24 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.