Laserfiche WebLink
6 <br />C-1981-012 Table of Contents TR-76 07/25/2022 <br />List of Maps <br />Map Title Date on Map Approved with <br />6a sheet 12 Allen Seam Structure Contours (to top of seam) 5/25/2011 PR-02 <br />6a sheet 13 Blue-Maxwell Interburden Thickness Contours 5/25/2011 PR-02 <br />6a sheet 14 Maxwell-Apache Interburden Thickness Contours 5/25/2011 PR-02 <br />6a sheet 15 Apache-Allen Interburden Thickness Contours 5/25/2011 PR-02 <br />6a sheet 16 Blue-Apache Interburden Thickness Contours 1/7/2011 PR-02 <br />7 Cross Sections - Coal Seams 1/12/2011 PR-02 <br />8 Regional Hydrology 5/10/2012 MR-116 <br />9 Soils 3/19/1987 <br />10 Vegetation Map 10/15/2014 TR-68 <br />11 sheet 1 East Portal Road, Slope Track and Cut Areas 7/18/2022 TR-76 <br />11 sheet 2 East Portal Utilities 7/18/2022 TR-76 <br />11 sheet 3 East Portal Facilities 7/18/2022 TR-76 <br />11-4 RDA – Haul Road Plan and Profile 08/19/2014 TR-70 <br />11-5 Haul Road Culverts 03/04/2022 TR-76 <br />11-6 Haul Road Watersheds 03/14/2022 TR-76 <br />11-7 Haul Road Alignment Plan and Profile 05/03/2022 TR-76 <br />11-8 Haul Road Alignment Plan and Profile 05/03/2022 TR-76 <br />11-9 Haul Road Alignment Plan and Profile 05/03/2022 TR-76 <br />11A Apache Canyon Airshafts 3/28/2009 TR-50 <br />12 West Portal Area Roads, Utilities and Facilities 7/25/2012 TR-65 <br />13 East Portal Sediment and Surface Water Control Plan 7/16/2019 RN-7 <br />13a Sediment and Surface Water Control Silo Area 3/25/2011 TR-55 <br />13b Post-Mine Topography Drainage Basins 10/23/1997 <br />14 West Portal Sediment and Surface Water Control Plan 7/31/2013 TR-68 <br />15 Surface Disturbance/Post Mining Land Use East <br />Facilities <br />8/22/2014 TR-68 <br />15a Post Mining Land Use Haul Road 03/04/2022 TR-76 <br />16 Surface Disturbance/Post Mining Land Use West Portal 8/9/2009 TR-51 <br />17 Post Mining Topography and Cross Sections 3/12/1998 TR-41 <br />17a Water Tank Post-Mine Topography 9/1/1998 <br />18 Apache Canyon, Ciruela Surficial Geology 10/8/198S <br />19 Apache Canyon, Ciruela Cross Sections 10/9/1985 <br />20 sheet 1 Structure Inventory Map - Overall 4/20/2012 MR-114 <br />20 sheet 2 Structure Inventory Map - Detailed Locations 4/20/2011 TR-56 <br />20 sheet 3 Structure Inventory Map - Detailed Locations 4/20/2011 TR-56 <br />20 sheet 4 Structure Inventory Map – Detailed Locations 2/06/2012 PR-04 <br />21 Non Coal Waste Disposal Area 10/14/1985 TR-41 <br />22 Mine Progress 7/5/1982 <br />23 Bore Hole Map 10/18/2013 TR-68 <br />24 Refuse Area 3/22/1995 MR-77 <br />25 Typical Drill Pad Sedimentation Control 2/13/2012 MR-107 <br /> <br />