Laserfiche WebLink
4 <br />C-1981-012 Table of Contents TR-76 07/25/2022 <br />List of Tables <br />Table Title Page <br />2.05) <br />Table 23 Sediment Pond Dimensions RN-6 page 31 <br />Table 24 Soil Balance for the Refuse Disposal Area RN-7 page 36 <br />Table 25a Soil Test Parameters RN-6 page 58 <br />Table 25b Criteria to Establish Overburden Suitability (in potential root zone) RN-6 page 58 <br />Table 26 Rangeland Seed Mix RN-6 page 62 <br />Table 26A Comparison of New Elk Slurry Water Quality with Water Quality <br />Standards (Now Figure 20 in Figures section at the end of section 2.05) <br />RN-6 page 2.05-99 <br />Table 26B Projections of the Flooded Workings Water Quality Following <br />Recycling of Thickener Water for Key Constituents (now Figure 21 in <br />figures section at end of section 2.05) <br />RN-6 page 2.05-101 <br />Table 26C Impacts to the Middle Fork of the Purgatoire River from <br />discharges from the flooded workings (now Figure 22 in figures section <br />at the end of section 2.05) <br />N/A <br />Table 27 Hydrologic Monitoring Frequency Requirements TR-73 page 105 <br />Table 28 Water Quality Analysis Parameters RN-6 page 106 <br />Table 29 Parameters of Column Leach Tests RN-6 page 2.05-79 <br />Table 30 Leaching Data for Coal Refuse RN-6 page 2.05-81 <br />Table 31 Results of Chemical Analysis RN-6 page 2.05-83 <br />Table 32 Time Variation of Quality of Effluent from Backfill Channel RN-6 page 2.05-87 <br />Table 33 Effect of Backfill on Quality of Alluvial Ground Water RN-6 page 2.05-90 <br /> <br /> <br />List of Figures <br />Figure Title Page <br />Figure 1 Generalized Stratagraphic Section of the Permit Area TR-58 page 2.04-10a <br />Figure 1a Regional Map of Previous Cultural Features TR-56 page 2.04.6 <br />Figure 2 Estimated life of Mine Plan Area RN-7 <br />Figure 2a Water Distribution Typical Vault Construction Detail TR-54 <br />Figure 2c Apache Canyon Airshafts TR-54 <br />Figure 2d Substation and Rock Dust System Cut Runoff Routing Detail TR-53 <br />Figure 2e Development Waste Disposal Area Runoff Routing Detail TR-66 <br />Figure 2f Runoff Routing Detail - Bates Portal and Reclamation Area TR-55 <br />Figure 3 Typical Embankment Cross Section TR-41 <br />Figure 4 Water Flow Sheet TR-41 <br />Figure 5 Water Storage & Mine Discharge Pond 001 <br />Figure 5a Emergency Spillway Design Cross Section TR-49 <br />Figure 5b Layout and Cross Sections of Subsoil Storage Area TR-55 <br />Figure 6 Proposed RDA Configuration TR-41 <br />Figure 7 Refuse Disposal Area Conceptual Fill Configuration TR-41 <br />Figure 8 Refuse Disposal Area Generalized Cross Sections TR-41 <br />Figure 9 Refuse Disposal Area Benched Keyway Cut <br />Figure 10 None <br />Figure 11 Refuse Disposal Area Cross Section A-A Final Configuration and Slope <br />Face Typical Section <br />TR-41