Laserfiche WebLink
2 <br />C-1981-012 Table of Contents TR-76 07/25/2022 <br />Rule/ <br />Subsection Title Page <br />2.04.8 Climatological Information TR-56 page 2.04-33 <br />2.04.9 Soils Resource Information TR-56 page 2.04-33a <br />2.04.10 Vegetation Information TR-76 page 2.04-42 <br />2.04.11 Fish and Wildlife Resources Information TR-76 page 2.04-47 <br />2.04.12 Prime Farmland Investigation TR-68 page 2.04-52 <br />Rule 2.05 Application for Permit for Surface or Underground Mining Activities RN-7 page 1 <br />2.05.1 Objectives RN-7 page 1 <br />2.05.2 Operation Plan-Life of Operation RN-7 page 1 <br /> (1) Production Methods and Equipment RN-7 page 1 <br /> (2) Operation Description RN-7 page 2 <br />2.05.3 Operation Plan-Permit Area RN-7 page 3 <br /> (1) Production Methods and Equipment RN-7 page 3 <br /> (2) Description of Surface Operations RN-7 page 4 <br /> (3) Mine Facilities RN-6 page 7 <br /> (4) Ponds, Impoundments & Diversions RN-7 page 20 <br /> (5) Topsoil RN-6 page 35 <br /> (6) Overburden RN-7 page 41 <br /> (7) Coal Handling Structures RN-7 page 41 <br /> (8) Coal Processing Waste and Non-coal Processing Waste RN-6 page 43 <br /> (9) Return of Coal Processing Waste to Abandoned Workings RN-6 page 51 <br />2.05.4 Reclamation Plan RN-6 page 52 <br /> (a) Timetable RN-6 page 52 <br /> (b) Reclamation Cost Estimate RN-6 page 53 <br /> (c) Backfilling and Grading RN-6 page 54 <br /> (d) Topsoil Removal, Storage, and Redistribution RN-7 page 55 <br /> (e) Depth of Cover Requirement-Development Waste Pile (DWP) and Refuse <br />Disposal Area <br />RN-7 page 56 <br /> (f) Revegetation RN-6 page 58 <br />2.05.5 Post-mining Land Use TR-76 page 69 <br />2.05.6 Mitigation of Surface Coal Mining Operation Impacts TR-76 page 69 <br /> Air Pollution Control Plan TR-76 page 69 <br /> Protection of Hydrologic Balance RN-6 page 71 <br /> Protection of Public Parks and Historic Places TR-76 page 110 <br /> Surface Mining near Underground Mining RN-6 page 111 <br /> Subsidence Survey, Monitoring and Control Plan RN-6 page 111 <br />Rule 2.06 Requirements for Permits for Special Categories of Mining 2.06-1 <br />2.06.1 Scope0 2.06-1 <br />2.06.2 Experimental Practices Mining 2.06-1 <br />2.06.3 Mountaintop Removal Mining 2.06-1 <br />2.06.4 Steep Slope Mining 2.06-1 <br />2.06.5 Permits Incorporating Variances from Approximate Original Contour <br />Restoration Requirements for Steep Slope Mining <br />2.06-1 <br />2.06.6 Prime Farmland 2.06-1 <br />2.06.7 Variance for Delay in Contemporaneous Reclamation Requirements in <br />Combined Surface and Underground Mining Operations <br />2.06-2 <br />2.06.8 Surface Coal Mining and Reclamation Operations on Alluvial Valley 2.06-2