Laserfiche WebLink
<br />Section 2.05 TR-76 10/19/2021 <br />30 <br />Culvert Number 10- 24 Hour Peak <br />Discharge (CFS) <br />Minimum Diameter <br />Inches(1)(As-built Inches) <br />Comments <br />73 8.75 24 TR-60 12/11 <br />74 8.75 24 TR-60 12/11 <br />75(8)** 52.05 42 TR- 62 01/12 <br />76(8)** 52.05 42 TR- 62 01/12 <br />77 1.75 12 TR- 66 05/12 <br />77A(8)** 1.75 12 TR- 66 05/12 <br />78 1.75 12 TR- 66 05/12 <br />79 39.74 36 TR- 64 04/12 <br />80 28.01 36 TR- 64 04/12 <br />RDA-A 4.16 12 TR- 66 05/12 <br />RDA-B 1.86 12 TR- 66 05/12 <br />81 13.90(7) 30 TR- 66 08/12 <br />82 17.78 30 TR- 65 06/12 <br />83(8)** 7.02 18 TR- 65 06/12 <br />84(8)** 7.02 18 TR- 65 06/12 <br />85 30.51 36 TR- 65 07/12- On <br />DOW Land <br />88 RDA <br />89 PR 120 (Pre-law) <br />90 0.12 12 MR-129 <br /> <br />(1) From “Handbook of Steel Drainage and Highway Construction Products,” nomograph with no head on pipe and using <br />HW/D Scale No. 3 <br />(2) Sized using 3 Ft. of head on pipe (HW/D=1.5), HW/D Scale No. 1 <br />(3) Sized using 2.4 Ft. of head on pipe (HW/D=1.8), HW/D Scale No. 3 <br />(4) Culverts 23 & 24 are inlets culverts to culvert 25. Culvert 25 was sized using the Hazen- Williams formula Exhibit 19, <br />West Portal Data C21 through C25 <br />(5) Sized using 3 Ft. of head on pipe (HW/D=1.5), HW/D Scale No. 1 <br />(6) As Built 03/27/88 SDM <br />(7) 100-Year 24-Hour peak discharge. Temporary culverts installed as needed <br /> (8)** Temporary culverts installed when required for site assess, then removed. <br />Sediment Ponds are inspected and an inspection report issued quarterly as required by Rule 4.05.9(17). <br />An annual inspection is also completed as required by Rule 2.05.9(15). The annual inspection includes a <br />differential level survey to determine water and sediment levels to document available storage capacity <br />and determine if sediment clean-out is required. If water levels preclude a determination of sediment <br />accumulation shall be monitored and surveyed as soon thereafter as practical. <br />Table 23 provides design criteria for sediment pond construction and maintenance. In addition five <br />containment basins provide localized sediment control for small areas within the mine disturbance area <br />not reporting to sediment ponds. Design criteria for these facilities can be found in Exhibit 19, Volume 2 <br />Item 5. As-built drawings and stage storage curves useful in evaluating requirement for sediment <br />removal can be found in Exhibit 32. <br />